Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    A Comparison Of Environmental Permitting Requirements And Costs Chile And The Last Frontier

    By R. T. Richins

    Coeur d'Alene Mines Corporation (CDE) is a precious metals mining company. The company's three mining operations are located In Nevada and Idaho. Collectively, these mines (Rochester in Neva

    Jan 1, 1993

  • SME
    Geologic Constraints on Mining and Recovering Coal in the Western US

    By Ralph J. Anctil, James E. Palmer

    According to relatively recent estimates by the US Geological Survey and the US Bureau of Mines, there are more than 0.9 Tt (one trillion tons) of remaining identified coal resources in the seven majo

    Jan 8, 1982

  • SME
    Innovative Support of Cross-Passage Openings in Segmented Liner

    By Karel Rössler, Petr Vítek

    "The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi

    Jan 1, 2016

  • SME
    How A Financier Can Handle The Mine Environmental Rehabilitation Costs: The Case Of The Ranger Uranium Mine, Australia

    By C. R. Tinsley

    In maybe the world's first in a mine project financing, a US $55 million Rehabilitation Indemnity was given on behalf of the banks in a US $250 million loan to develop the Ranger uranium mine, No

    Jan 1, 1992

  • SME
    Improvement Of The Selectivity In Electrostatic Separation By Modifying Particle Surface

    By Shuji Owada, Keisuke Yasukawa

    Electrostatic and/or high tension separation has been used for the separation of rare metal bearing minerals, foods, industrial wastes and so on. Since the separation is achieved by the difference mai

    Jan 1, 1995

  • SME
    A Case Study on the Efficacy of Different Roof Bolting Schemes in Lhoist North America’s Crab Orchard Mine

    By Reece Kurre, Gabriel Walton

    "Roof bolting has long been used in underground mines across the world to provide ground support. Modern roof bolts are cheap and easy to install with the use of specialized machines as a part of the

    Jan 1, 2019

  • SME
    Assessment Of Weak Altered Rock Masses At The Island Creek Copper Mine

    By R. S. Olsen

    Intensely altered rock has had a large effect on slope stability as slopes increase in height at Island Copper mine. Traditionally used, fracture-controlled rock slope stability design techniques have

    Jan 1, 1987

  • SME
    Pilot-Plant Pressure Filtration Of Coal-Preparation-Plant Refuse Slurry

    By D. W. Hutchinson

    One of the most important problems facing the coal industry today is the disposal of refuse from the coal preparation plants in a safe, economical, and efficient manner while complying with all legal

    Jan 1, 1977

  • SME
    Cost-Benefit Analysis Of Computer-Assisted Mining Through Production And Cost Modeling

    By Suresh K. Bhatt

    A mathematically simulated modeling technique is used in this U.S. Bureau of Mines paper to represent a hypothetical mining operation with existing mining technology and prevalent mining costs. Mining

    Jan 1, 1991

  • SME
    Separating Underground Metro Lines under Operation in Baku

    By Elena Chiriotti, Federico Valdemarin, Jan Cenek

    "SUMMARY The “28 May Station” is the only transfer station between the existing Green and Red metro lines in Baku. As part of the huge development strategy of the metro network, the complete separatio

    Jan 1, 2016

  • SME
    Development Of Stillwater Mining Company's East Boulder Project Using Tunnel Boring Technology

    By C. Alexander

    Stillwater Mining Company is developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in south central Montana. A 5650 meter (18,

    Jan 1, 1999

  • SME
    Industrial Waste Disposal By Deep Well Injection

    By A. C. Barlow

    The use of deep wells for waste disposal is not a new technique. The production phase of the oil industry has been using this method to dispose of unwanted oil field brine since the 1930's The a

    Jan 1, 1964

  • SME
    Discrete Simulations Quantifying the Effects of Material Handling Conveyors in Series or Parallel Oreflow Streams

    By K. J. Shelswell

    This work describes the design, analysis, and comparison of discrete simulation and static spreadsheet models developed to compare the oreflow efficiency of two conveyor-based material handling system

    Feb 23, 2014

  • SME
    Centrifugal Concentration and Separation of Precious Metals

    By Byron V. Knelson

    Although the concept of centrifugal recovery has been around in one form or another for many years, it has not been until recent times that it has become clearly understood and properly put into persp

    Jan 1, 1988

  • SME
    Reinflation Testing Of Inflatable Friction Rock Bolts - SME Annual Meeting 2023

    By J. Hallowell, M. Conley, R. Cook

    Inflatable friction rock bolts (IFRBs) are often considered temporary ground support due to their susceptibility to weakening from corrosion. The effective service life of an IFRB can be difficult to

    Feb 1, 2023

  • SME
    The Feasibility Of Hybrid Network And Cfd Modeling For Mine Ventilation Applications

    This paper examines the feasibility of combining network modeling and computational fluid dynamics for modeling of underground mine ventilation systems. Both simulation methods have specific advantage

    Feb 23, 2014

  • SME
    Development of a Bubble-Coarsening Froth Model

    By S. Park

    In a flotation froth (and foam), air bubbles become larger due to coalescence, causing less hydrophobic particles to drop off. A bubble-coarsening model has been developed by calculating the changes i

    Feb 23, 2014

  • SME
    Developing The DOZ Mine At PT Freeport Indonesia

    By John Barber

    The Deep Ore Zone (DOZ) Mine is PT Freeport Indonesia's (PTFI) newest operation. Production at the mine began in September 2000. The DOZ Mine produces 25 kt/d (27,500 stpd) using mechanized block

    Jan 1, 2001

  • SME
    Semicontinuous biooxidation of high-sulfur concentrates: Relationship between volume or mass dissolution rate and pulp density - Mining, Metallurgy & Exploration (2018)

    By H. Y. Yang, L. L. Tong

    Semicontinuous-flow, multistage biooxidation experiments of a Chinese refractory, high-sulfur gold concentrate were conducted with different pulp densities for gold recovery. The maximum iron, sulfur

  • SME
    In-Situ Leaching Of Crownpoint New Mexico Uranium Ore. IV. Laboratory Study Of Strong Leaching Systems: Oxidant- Sulfuric Acid ? Introduction

    By T. C. Vogt

    Earlier we described the uranium mineralogy of an areally broad sampling of Crownpoint ore, including the characterization of organic carbonaceous material associated with the uranium mineral. (1) We

    Jan 1, 1981