Abstract
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, which would not interfere with the EPBM clearance envelope during the scheduled pull back of the EPBM through both tunnel tubes. For that reason support frames or radial bolting could not be used. Steel rods inserted into the neighboring segments during the ring assembly, and later grouted were tested and realized as an innovative solution. The paper presents practical experience gained with the segmented liner support during cross-passages construction. INTRODUCTION An innovative solution using the grouted dowels was developed and realized for sixteen cross-passage openings of the twin Ejpovice Tunnels, whose construction was part of the railway track Rokycany – Plzen modernization. The following paper described practical experience gained with the innovative support of cross-passage openings, which was realized by short steel dowels grouted within the segments of the EPBM segmented liner. The paper is a continuation of the paper published in WTC 2015, which described the design aspects of the grouted dowels support, while the following paper concentrated on the production, and the performance of the dowel support observed during the breakout for the cross-passages openings. The connection by grouted dowels was patented by Metrostav, a.s. Company THE EJPOVICE TUNNELS CONSTRUCTION The Ejpovice tunnels construction started in 2013. The start of the high speed train operation through the tunnels was planned for 2018. The project was funded by the state government with the support of European Union funds of up to 70%.The tunnels were excavated with one EPBM (Earth Pressure Balanced Machine) with the external diameter of 9.89 m. The segmental liner inner diameter was 8.7 m, and thickness of 0.4 m. First, the South tunnel tube was excavated from the East portal, then the EPBM was pulled back through the South tunnel, and the excavation was started from the same portal for the North tube. After the South tube was freed from the EPBM excavation operations the cross-passage construction started. Due to the short time schedule, in the North tube the cross-passage construction started while the tunnel was still under construction. Therefore, the cross-passage construction was performed concurrently with the segments transportation, and with the EPBM pull-back through the tunnel. There were 8 cross-passages along the tunnels with a maximum distance of about 500 m, Fig.1."
Citation
APA:
(2016) Innovative Support of Cross-Passage Openings in Segmented LinerMLA: Innovative Support of Cross-Passage Openings in Segmented Liner. Society for Mining, Metallurgy & Exploration, 2016.