Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A review of dry cover placement on extremely weak, compressible tailings

    By A. T. Jakubick, A. MacG. Robertson

    This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a

    Jan 1, 2000

  • CIM
    Efficient metal production aims to reduce CO2 emissions

    By Elhachmi Es-Sadiqi

    "For over 40 years, CANMET has focused its research on value-added products and energy efficiency in the metals industry. The Efficient Metal Production Program is currently managed by Dr. Elhachmi Es

    Jan 1, 1998

  • CIM
    Operating Cost Budgets for Mines

    By Leonard Kellogg

    Introduction The Mine Manager or Superintendent is a man faced with a difficult problem. He must direct the activities of his mine in such a manner that, over a period of time, the greatest possible

    Jan 1, 1952

  • CIM
    Vibration Coupling and Numerical Analysis on Self-Synchronous Feature of Inertia Vibration Crusher

    By Long Han, A. V. Kalinin, Xiujian Luo, Xiaobo Wang, Xiaoou Xia

    "Inertia vibration crusher is a kind of vibration equipment which crushes ore by vibration. When the inertia vibration crusher works, ore between the two moving jaws is subjected to the high frequency

    Jan 1, 2016

  • CIM
    Review of High Pressure Tuyere Injection

    By A. E. M. Warner, I. E. Hills, C. L. Harris

    Since the late Dr. Keith Brimacombe, et al, performed tests at the now-closed Asarco Tacoma smelter and the Inco Copper Cliff Smelter on Peirce-Smith copper converters almost thirty years ago, many Py

    Jan 1, 2007

  • CIM
    Cyclones at East Malartic Mines Ltd.

    By J. W. Keyes

    "The original grinding circuit at East Malartic consisted of two 8 by 8 C.A.C. mills in closed circuit with two 72 inch Akins Classifiers and an 8 by 10 secondary mill in closed circuit with two 48 in

    Jan 1, 1964

  • CIM
    Use of Non-Ionic Surfactants as Emulsifier in Coal Flotation: An Experience from Lab-Scale to Plant

    By M. P. Sinha, Rashmi, Tata Steel Ltd., S. Jaiswal, A. Bhatnagar, P. Garg

    Reagents form a crucial part of flotation process as they have the power to control the surface properties of minerals. In case of coal flotation, collectors and frothers are two the important and com

    Jan 1, 2016

  • CIM
    Canadian Copper and its Production

    By C. P. Browning

    Copper, as far as we know, was the first metal used by man, and due to the fact that it occurs in many places in the 'native' state, and also to the ease with which it may be shaped, it has

    Jan 1, 1927

  • CIM
    Blind drilling for shaft development

    By James H. Cobbs

    Blind boring of shafts is becoming an increasingly important part of shaft sinking. Blind-bored shafts have reached diameters of 25 It in Europe and 16-1/2 ft in the United States. Much of the technol

    Jan 1, 1979

  • CIM
    Mineral resource + engineering, economic and legal feasibility = ore reserve

    By M. Vallée

    Several reviews of mineral project performance in the past 35 years indicate a pattern of occasional, but recurrent, mining project failures due to shortcomings in geological information and estimatio

    Jan 1, 2000

  • CIM
    Development of Hot Backward Extrusion on an Uranium Alloy using Finite Element Calculation

    By W. Geslin

    Backward extrusion process is a metal forming process, which limits the manufacturing?s extra thickness when compared with classical die forging technique. Because of a lack of alloy?s mechanical beha

    Aug 1, 2010

  • CIM
    Low-Temperature Pressure Leaching Kinetics of Zinc Sulphide Concentrate

    By F. Guo

    "The leaching kinetics of zinc sulphide concentrate was studied under total pressures ranging from 0.3 MPa to 0.5 MPa and leaching temperatures ranging from 358 K to 378 K. The apparent activation ene

    Jan 1, 2012

  • CIM
    How Rock Properties Understanding From Micro to Macro Scale Affect Productivity Profile of Tight Reservoirs: Neuquén, Argentina

    By F. Sorenson, P. A. Castellarini, F. Garbarino, M. N. Garcia

    "Recently, significant efforts to improve productivity from the tight intervals of the Mulichinco Formation within the Sierra Chata Field in the Neuquén Basin have been ongoing. Because conventional h

    Jan 1, 2015

  • CIM
    The Tanco Pegmatite, Southeastern Manitoba

    By R. A. Crouse

    The Tanco pegmatite at Bernie Lake, in the Lac du Bonnet mining district of southeastern Manitoba, is a unique deposit of Li, Rb, Cs and Ta, with substantial reserves of Be and several industrial mine

    Jan 1, 1979

  • CIM
    Slope Stability at Lac Jeannine

    By J. M. Réjean Gagnon

    "Quebec Cartier Mining Company is currently mining a low-grade iron ore deposit in northeastern Quebec. The Company is producing some 8,000,000 dry gross tons of concentrates per year, grading about 6

    Jan 1, 1968

  • CIM
    Operation of Centrifugal Pumps

    By Mark W. Booth

    THE Dominion Steel and Coal Corporation, as a coal mining concern and as a steel industry, has much pumping to do, and the conditions are as varied as it is possible to make them. We are faced with ha

    Jan 1, 1944

  • CIM
    GHG Emission Reduction Strategies for Exogenous Pyrometallurgical Processes

    By A. H. Burns

    "Regenerative and recuperative burner systems require advanced combustion techniques to minimize NOx emissions. Various methods of pollutant minimization and furnace design considerations are describe

    Jan 1, 2012

  • CIM
    The Collection and Recovery of Gold from Roaster Exit Gases at Giant Yellowknife Mines Limited

    By E O. Foster

    When roasting started at Giant Yellowknife Mines in 1949, it became apparent that, to prevent air and water pollution in the surrounding district, it would be necessary to collect the arsenic that was

    Jan 1, 1963

  • CIM
    Stope-and-Pillar Design for the Elliot Lake Uranium Mines

    By D. G. F. Hedley, F. Grant

    "In 1958, the Ontario Department of Mines appointed a committee to study the accident situation and mining methods used in the uranium mines in the E1liot Lake district. This committee reviewed the ex

    Jan 1, 1972

  • CIM
    Two Years? Experience With Copper Anode Casting At Hudson Bay Mining and Smelting Co., Ltd.

    By A. A. McDonald

    Anode casting has been in operation for two years in Hudson Bay Mining and Smelting's Flin Flon smelter. The new plant allows all casting to be done on one shift and so achieves considerable labo

    Jan 1, 1977