Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design of Sample Plants ù Getting it Right First Time

    The basic rule for correct design of a sample plant is that all parts of the material being sampled must have an equal probability of being collected and becoming part of the final sample for analysis

    Jan 1, 2005

  • AUSIMM
    (U-Th)/He Geochronology of Channel Iron Deposits, Robe River, Hamersley Province, Australia – Implications for Ore Genesis

    By M Danišík

    Two drill core samples of haematite/goethite from the Robe River (Western Australia) channel iron ore deposits (CID) were dated using (U-Th)/He methods in order to constrain the timing of iron oxide f

    Jul 11, 2011

  • AUSIMM
    The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

    By Smith M, Milton T, Pitt G

    High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyc

    Jan 1, 1987

  • AUSIMM
    Gold Mineralization in a High Uplift Rate Mountain Belt, Southern Alps, New Zealand

    By Johnstone RD, Rattenbury MS

    RACE Quartz-calcite veins containing Au, As, W, Cu, Pb, Zn and Fe cross-cut Alpine Fault- related structures in the Alpine Schist of South Island, New Zealand. These veins, and some other related v

    Jan 1, 1987

  • AUSIMM
    Problem of Limitation of Oscillation of Winder Ropes

    By Jaracz K

    At the operation of mine winders in deep shafts considerable oscillations of winding ropes may occur due to elasticity of both wind-ing and balance ropes. The amplitudes of longitudinal oscillations m

    Jan 1, 1985

  • AUSIMM
    Gold Silver Mineralization At Newvesville, Coromandel Peninsula, N.Z.

    By Torckler L, Brathwaite R. L

    At Neavesville gold-silver (electrum) mineralization occurs in steeply-dipping zones of intense fracturing, brecciation and quartz veining within rhyolitic pyroclastics, carbohaceous shales and an

    Jan 1, 1980

  • AUSIMM
    The Steel Business - A Review

    By Burgess J, Brownrigg A

    The world steel industry underwent rapid growth from 1950 to 1970. Since that time, production growth has been relatively slow, with declining production in the developed countries and increasing prod

    Jan 1, 1992

  • AUSIMM
    A Positive Effect on Productivity - The Introduction of Breast Mining Techniques to Emperor Gold Mining Company Ltd, Vatukoula, Fiji

    By Harmse C

    Gold mining in Vatukoula had been a low tonnage/high grade operation for much of its 55-year life. During 1991 it became clear that a change in direction was needed if the mine was going to continue t

    Jan 1, 1993

  • AUSIMM
    Sampling High Purity Copper Cathodes

    Interest in the sampling of refined copper cathodes has heightened over the last ten years. This has followed the increasing importance of cathodes as the principle trading form for metallic copper. I

    Jan 1, 1976

  • AUSIMM
    The Kintyre Uranium Deposit: An Exploration Case History

    By Andrew R. L

    The Kintyre uranium deposit was discovered in 1985 in the course of following up radio- metric anomalies generated in an earlier air- borne survey. The latter survey was conducted primarily to acqui

    Jan 1, 1988

  • AUSIMM
    Oroclinal Blending in the Evolution of the New England - Yarrol Orogenand the Moreton Basin

    By Korsch RJ

    Permian oroclines in eastern Australia must have formed by sliding on a detachment surface. It is identified as a westward- dipping Devonian and Carboniferous sub- duction zone. Major strike-slip fa

    Jan 1, 1987

  • AUSIMM
    Planning for Large Scale Bulk Port Development Projects

    This paper discusses design concepts in planning a large modern bulk terminal. The need is emphasised for a studied master plan, in-built materials handling flexibility and staged development. An

    Jan 1, 1983

  • AUSIMM
    Continuous Haulage the Coal and Allied Experience

    By Lennox A

    In an attempt to increase underground productivity Coal and Allied has introduced a continuous haulage unit into it's Moonee colliery. A second unit is planned for Nallarah colliery in the ne

    Jan 1, 1988

  • AUSIMM
    Wear Rate Evaluation of Mill Lining and Grinding Media Materials

    By Wingham DW

    Based upon the previous work of Norman and Loeb, a method, was used, to assess-the comparative wearing properties of ten different alloys being used, or being considered for use, as mill liners and g

    Jan 1, 1963

  • AUSIMM
    Broken Hill Metallurgy - A Story of Innovations in Processes, Equipment and Instruments

    By AJ LYNCH

    Broken Hill metallurgists have been responsible for some of the most important developments in mineral processing technology. These occurred mainly in two periods, 1902 - 15 and 1955 - 70. Mineral

    Jan 1, 1992

  • AUSIMM
    Grade Control Strategies and Reconciliation Procedures at Kidston Gold Mine, North Queensland

    The large, low grade, Kidston Gold Mine in North Queensland has achieved outstanding economies of scale and profitability. The total mineable ore reserve including mined to-date (as at December 1993

    Jan 1, 1994

  • AUSIMM
    Research and Development in the Micron Research (W. A.) Solvent Procedure for Gold Elution from Carbon

    By Hinchliffe WD, Griffin A

    The desorption of gold from activated carbon is promoted by adding organic solvents to aqueous cyanide solutions. At 65-80¦ the elution of gold is fast and is not affected by water quality. The Micron

    Jan 1, 1984

  • AUSIMM
    Radio Noise Monitoring During Rock Fracture at Blast Sites

    By Thiel D. V

    It is quite well known, although not so well documented, that radio noise is generated during rock fracture. Radio noise has also been observed during severe earthquakes. The source has been though

    Jan 1, 1990

  • AUSIMM
    Introduction of Autonomous Loaders to Olympic Dam Operations, Australia

    WMC Resources Ltd has been involved the development and trialling of an automated load haul dump vehicle system since 1997. This paper describes the introduction of the system into the Olympic Dam Ope

    Jan 1, 2005

  • AUSIMM
    Mine Haulage - Options and the Process of Choice

    In the last eight years inclined conveyor haulage systems have established themselves in the mainstream for hard rock underground mine haulage. This leaves the question; what else might be on the hori

    Jan 1, 2008