Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Telfer Commences Underground Mining - A Case Study

    Newmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main

    Jan 1, 1991

  • AUSIMM
    Origin and Provenance of Submarine Volcaniclastic Rocks in the Late Permian Drake Volcanics, Northeastern New South Wales

    The Late Permian intermediate to silicic talc-alkaline Drake Volcanics of New England, N.S.W., consist largely of shallow marine, redeposited volcaniclastic rocks which host epithermal Ag-Au depos

    Jan 1, 1987

  • AUSIMM
    Geology and Ore Genesis of Silver-Lead-Zinc-Copper Sulphide Deposits, Sunny Corner, NSW

    By Offler R, Lau J, Lea J. F

    The stratiform and vein-type pyritic silver-Iead-zinc-copper sulphide deposits of Sunny Corner, NSW are hosted by acid volcanic and clastic sedimentary rocks of Middle Silurian to Early Devonian age.

    Jan 1, 1984

  • AUSIMM
    Optimisation of Slope Angles at Rosario Mine, Collahuasi

    By A R. Bonani, M P. Pe±a

    The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p

    Jan 1, 2007

  • AUSIMM
    Blasting Rock to Suit Stringent Underground Fill Requirements

    Recent analysis of backfilling material has shown that a finer size distribution is preferable for stope filling. In order to increase crusher throughput and pit productivity, a reassessment of the

    Jan 1, 1995

  • AUSIMM
    Boron removal through multistage refining treatment using CaO-SiO2- Al2O3 slag

    By K L. Avarmaa, M A. Rhamdhani, A D. P Putera, H T. B M Petrus, G A. Brooks

    Multistage slag treatment was carried out to investigate boron removal from metallurgical grade silicon. Boron is known to be one of the most difficult elements to remove from silicon. Depending on bo

    Aug 21, 2024

  • AUSIMM
    Paper No. 163. The Mining And Metallurgy of Copper, Silver, Lead, and Zinc

    In order that the processes seen may be followed in their proper 'order, the subject will be dealt with as follows, (1) Wallaroo and Moonta Mines; (2) Wallaroo and Moonta Mines Smelting Works; (3

    Jan 1, 1907

  • AUSIMM
    Gold mineralisation on Woodlark Island, Papua New Guinea

    By Shatwell DO, Hayward SB, Leach TM

    Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila

    Jan 1, 1994

  • AUSIMM
    Trading Water Access Entitlements in Queensland

    By A Stasi, B Brice

    Water is a limited and precious resource in Australia. Because of the increasing demand for water from all sectors of the economy and the variability in supply, efficient management of water resources

    Jan 1, 2006

  • AUSIMM
    Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation

    By M Wortley, J McKay, D La Rosa, O Guyo

    It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert cont

    Jan 1, 2005

  • AUSIMM
    A Methodology for Geometallurgical Mapping and Orebody Modelling

    By L Keeney

    Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological

    Sep 5, 2011

  • AUSIMM
    Some characteristic features of chromite in the Marum Ophiolite Complex, Papua New Guinea

    The Ramu chromite deposit occurs in the Marum Ophiolite complex and is the most economically attractive chrom-ite deposit in Papua New Guinea. Its lateritic nickel, chromite and cobalt potential has a

    Jan 1, 1994

  • AUSIMM
    Borehole and Surface Geophysical Monitoring, and Simple Modelling of Groundwater Polluted by Waste Leachates

    By Barber C, Buselli G

    Detailed monitoring of point sources of groundwater pollution is expensive due to the high cost of drilling monitoring boreholes. Whether groundwater pollution is due to mining, industrial or domes

    Jan 1, 1988

  • AUSIMM
    Delayed Partial Melting of Subduction-Modified Magma Sources in Westerna Melanesia: New Results from the Late Cinozoic

    Many volcanoes in western Melanesia have tectonic settings and rock compositions that do not conform to conventional models of arc- trench systems. Part of the reason for this may be that in an env

    Jan 1, 1987

  • AUSIMM
    Classification And Quantification of Ore Grain Textures of the Hilton North Deposit, Mount Isa, Queensland, Australia

    Studying the ore textures in a discrete orebody is a novel approach to estimating liberation potential of the ore minerals present. As part of a PhD thesis, this project aims at classifying and quanti

    Jan 1, 1993

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Raise Drilling in Australian Coal Measures

    By Fraser RJ

    A Robbins Raise Drill Model 61R was used to provide one 7' diameter shaft 1050' deep in Clutha Development's exploratory mine at Blackwater in Central Queensland and two 7' diam

    Jan 1, 1972

  • AUSIMM
    Weak Acid Dissociable Cyanide Analysis Required for International Cyanide Management Code (ICMI) Compliance û Recent Refinements to an Online Weak Acid Dissociable Cyanide Measurement Device

    By H S. Smit, P Lotz

    Gold mining companies who are signatories of the International Cyanide Management Code (visit www.cyanidecode.org for further information) are required to measure WAD cyanide on-line and destroy WAD c

    Jan 1, 2008

  • AUSIMM
    Development Philosophy

    By Bruington T, Perkins J, Hutton R

    Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo

    Jan 1, 1997

  • AUSIMM
    The Electronic Delay Detonator Trial at KCGM Mount Charlotte Operation

    By D Caffrey

    To demonstrate the advantages of using electronic delay detonators over pyrotechnic detonators, a trial using the DNES Dynatronic System was conducted at the KCGM Mount Charlotte operation in 1998. Th

    Jan 1, 1999