Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 1238 KB
- Publication Date:
- Jan 1, 2005
Abstract
It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert control system and image-based oversize detection system, VisioRock, at the Pilbara Iron Tom Price facility are dispelling these notions. A constraint-based OCS¬ expert control system has been designed and commissioned on the high-grade crushing and screening plant along with a vision-based oversize detection system functioning on six product conveyor belts. To date, the expert control has demonstrated the ability to increase production by maximising dynamic constraint utilisation. Dynamic constraint utilisation is a concept developed by Rio Tinto Technical Services for effectively evaluating constraint-based control logic performance. The VisioRock system has been installed and configured and has been operating for a period of several months. Currently, Tom Price and Metso personnel are working to define correct oversize detection thresholds. Details of the plant implementation are discussed.
Citation
APA:
(2005) Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price OperationMLA: Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation. The Australasian Institute of Mining and Metallurgy, 2005.