Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic RidgeBy J. W. Jamieson, J. Escartin, A. Steinführer
Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C
Sep 1, 2014
-
Framework For Stochastic Modeling Of Dragline Energy EfficiencyBy M. A. Oskouei
Draglines are the main energy consumers in strip mines. Given the growing cost of energy and environmental concerns, it is important to properly understand dragline energy efficiency. The goal of curr
Feb 27, 2013
-
Design And Start Up Of The Cortez Gold Mines Pipeline MillBy R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
A Proposed Model Of A New Laboratory Magnetic Separator For Mineral Processing. - Preprint 09-120By M. S. Riyazulla
A model of a new laboratory magnetic separator has been conceived to cater the needs of process engineers and mineralogists world over engaged in mineral characterization and beneficiation. It would b
Jan 1, 2009
-
Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill GroutBy Lorenzo Pellegrini
The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and
-
Columbus Circle Station Complex - History and RehabilitationBy Aram Grigoryan
This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th
Jan 1, 2008
-
Construction of the Pergau Hydroelectric Power Project, MalaysiaBy Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Rehabilitation of a Brick-Lined AqueductBy Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick
BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006
Jan 1, 2007
-
Characteristic Curves Revisited: A More Logical Approach to Determining Operating Points – Preprint 97-53By L. M. English, Y. J. Wang
When plotted as head vs. volume, fan curves start high and decrease in head with increasing volume while mine head curves start low and rise with increasing volume. Their intersection is the system op
Feb 24, 1997
-
Annual Review 2005 – Exploration ReviewBy D. R. Wilburn
This summary of international mineral exploration activities for the year 2005 draws upon available information from literature, industry and U.S. Geological Survey (USGS) specialists. It provides da
Jan 1, 2006
-
St. Cloud Mining Company’s Stone House Zeolite Mine And New Uses For ClinoptiloliteBy G. S. Austin
The St. Cloud Mining Company extracts clinoptilolite about 6.5 km south of Winston, Sierra County, New Mexico. Production is about 18,000 mt/year. Natural zeolites are good adsorbents for positively c
Jan 1, 2002
-
The Next Step Change In The Size Of Mining ProjectsMany of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r
Feb 27, 2013
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous ProcessBy J. O. Marsden
Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f
Jan 1, 2007
-
Evolving Soft-Ground Tunneling in SeattleBy Leon Maday, Robert Robinson, Judy Cochran, Don Davis
Over the past 20 years, several soft-ground tunnels have been successfully completed in the Seattle area. These tunnels were built using design-bid-build contracting methods, and have benefited from a
Jan 1, 2005
-
Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, OhioBy Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski
Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p
Jan 1, 2005
-
Downsizing Maintenance to Improve Performance: Defining the Downsizing TaskBy Paul D. Tomlingson
Editor's note: This is the first of two articles on maintenance. Part two, "Effective maintenance downsizing techniques," will appear in the October issue of MINING ENGINEERING. Most mine mana
Jan 1, 1994
-
Cincinnati Features Aggregates and Industrial Minerals ProgrammingThe 2003 SME Annual Meeting and Exhibit will take place Feb. 24-26 in Cincinnati, OH. The meeting will feature a host of special symposia and programming geared toward the industrial minerals and agg
Jan 1, 2003
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge AlternativesBy M. A. Reyes, L. Yan
Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i
Nov 22, 2019
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007