Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Carbon Monoxide Poisoning at a Swface Coal Mine . . . . A Case Study
By Thomas Kovalchuk, Kenneth Eltschlager, William Shuss
In April of 2000, two adults and their newborn infant, were poisoned by carbon monoxide in their home and received medical treatment at a Pennsylvania hospital. Carboxyhemoglobin levels were; child -
Jan 1, 2001
-
Analysis of Cracks in Residences Near the Homestake Mining Company Open Cut Mine
By Claude R. Ayoub, Charles A. Kliche, David G. McDowall
Homestake Mining Company's Open Cut Mine is located in Lead, South Dakota, in the northern Black Hills. The mine is within 300 feet of occupied residences on the south end, and within 1200 feet on the
Jan 1, 1989
-
Detection of Geological Features using Aerial Image Analysis and Machine Learning
By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja
Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst
Feb 1, 2020
-
Unlocking the Wealth From Benefit Sharing in Drill and Blast
By Lawrie Logan, Mike Wiggin
This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen
Jan 1, 2001
-
A New Method of Shaft Sinking
By John Cowin, Dan McCutchen
Cowin & Company has specialized in underground construction since 1924. This paper reviews the sinking of two shafts in the Alabama coal fields using bulk-loaded explosives. Each shaft is eighteen hun
Jan 1, 2000
-
Large Scale Measurement of Velocity of Detonation
By Alastair Torrance, Braden T. Lusk, MinGi Seo, Gary Cavanough
Velocity of Detonation (VOD) is the most commonly used method to determine explosive performance as VOD is a function of the confinement (ground conditions) density and composition of the explosive. T
Jan 1, 2019
-
Plug Blast for a Powerhouse Intake Using an Unusual Technique
By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent
The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final
Jan 1, 2000
-
Seismic Waves caused by Reinforced Concrete Decks impacting the Ground
By Andrea Francioso, Roberto Folchi
In order to comply with the latest European Highway Standards, the highway Salerno - Reggio Calabria, in southern Italy, had do be widened and upgraded to reduce its vulnerability to earthquakes. Rein
Jan 1, 2013
-
The Effects of Various Wet-Hole Loading Methods on Powder Factor
By Neal Lee
Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,
Jan 1, 2011
-
Automation of Rock Fragmentation Analysis
By Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow
Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s
Jan 1, 2012
-
Safe Blasting Parameters And Seismic Influences During Construction Blasting
By Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek
The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,
Jan 1, 2009
-
Considerations in Blasting Influence on Grindability
By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta
The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f
Jan 1, 2015
-
Tunneling in Thinly Foliated Rockmass Conditions
By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Blasting Specifications and Guidelines for Protective and High-Profile Blasting
By Brian Lewis, Reinhold Daykin Schnell
Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger
Feb 6, 2023
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines
By Reinhold Daykin, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove
Feb 1, 2020
-
Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine
By D. Scott Scovira, Remi Proulx
The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco
Jan 1, 2000
-
Instrumentation and Monitoring Criteria to Determine Structural Response from Blasting
By H Y. Fang, H Sutherland, R M. Koerner
Due to the increased number of complaints by property owners to blasting related industries an apparent need for a clearer understanding of blasting-related damage is needed. We feel that direct struc
Jan 1, 1976
-
Utilization of Detonation Cord to Pre-split Pennsylvanian Aged Sandstone and Shale, Grundy, Virginia
By Calvin Konya, Steven S. Spagna, Ed Smith
During Summer 2001, the U.S Army Corps of Engineers awarded a contract to the construction firm of Bush and Burchett of Allen, Kentucky, for the purpose of developing a 13 acre redevelopment site by r
Jan 1, 2005
-
Minimising Coal Damage and Loss Due to Cast Blasting
By Tapan Goswami
The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research
-
Factors Governing the Muck Pile Characteristics
By David Cheung, S. Paul Singh
"The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie
Jan 1, 2017