Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Some Ideas and Problems on a Stochastic-Kinetic Sieving ModelBy Espig D, Standish N
In the paper a stochastic model of the batch sieving procedure is presen- ted resulting in a system of ordinary differential equations to describe the time dependence of the mass fractions on the
Jan 1, 1984
-
"The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"By J L. Macdonald, G S. King
"The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts
Jun 15, 2016
-
Methane Explosions at High Volume and Low ConcentrationThe most frequent initiation of coal dust explosion results from the ig- nition of high methane volumes, often at low concentration close to the minimum flammability limit, by a weak ignition sour
Jan 1, 1988
-
Modelling of the Ventilation System of a Deep Uranium MineBy S C. Bhowmik, R Gupta
This paper presents the ventilation problem faced by Jaduguda uranium mine, operated up to a depth of 905 m. The first two stages of the mine workings are up to 555 m, which are nearly exhausted. The
Jan 1, 2005
-
Bulk Low-Grade Mining at Mount Charlotte MineBy M F. Lee
Although the Mt Charlotte gold resource was discovered in 1893, it was only in 1954 that geologists correctly interpreted drill data and defined a large low-grade orebody. The mine has been a large, l
Jan 1, 2000
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western AustraliaBy J Lea, D C. Kettlewell
The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst
Jan 1, 2009
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to MiningBy J Joy, A Bye, G V. Kizil
This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame
Jul 10, 2012
-
Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Development of a cold bonding technology to high-grade iron ore concentrateBy J Caron, M Athayde, F Lavoie, R Joyce
Decarbonisation has become a major challenge for the global steelmaking industry, turning towards new technologies aimed at carbon footprint reduction, which on its own accounts for approximately 9 pe
Nov 8, 2021
-
PanAust Limited’s approach to mine waste and tailings stewardshipBy L P. Trout, D G. Reid
PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem
Jul 23, 2018
-
The Combustion Behaviour of Kambalda Nickel Concentrate and Collie CoalBy Jorgensen FRA, Moyle FJ, Turner TM
Laminar flow furnace techniques and thermal analysis were used to study the combustion of Kambalda nickel concentrate and Collie coal. The study was made to ascertain the suitability of the latter
Jan 1, 1982
-
Application of Pulp Chemistry to Regulation of Chemical Environment in Sulphide Mineral FlotationBy Woodcock JT
This paper reviews the chemistry of flotation pulps with the aim of gaining a better understanding of the effect of chemical environment in flotation and ap- plying the knowledge to improving the c
Jan 1, 1984
-
The Ernest Henry Mine Project - "The Mining Cycle"By T Amiconi
Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly pro
Jan 1, 1998
-
The Potential for Backfill in Highwall Mining (7bcc6ff0-6f9e-4f39-8e8f-1dbb9d479afe)By Boyd GL
Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research
Jan 1, 1998
-
The Correlation Between Ascending Mining and Stability of the Overlying StrataIn the process of mining the lower seam in a multi-seam operation, a lot of oblique fract- ures appeared in the upper seam which was in the equilibrium zone. These fractures closed soon after the l
Jan 1, 1986
-
A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress EnvironmentBy L Nienaber
Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper
Mar 8, 2011
-
A Simultaneous Optimisation Tool for Open Pit Mine SchedulingBy Y Ren
The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents
Sep 26, 2013