    Considerations in Pre-Split Blasting for Mines and Quarries

    By J Lyall Workman, Peter N. Calder

    "Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.

    Jan 1, 1993

  • ISEE
    Numerical investigation of impact of misfires and out-of-sequence delays on fragmentation and gravity flow in SLC

    By C. Yi, D. Johansson, C. San Miguel, M. Wimmer

    Sublevel caving (SLC) is a mass mining method based upon the utilization of gravity flow of blasted ore and caved waste rock. Production blasting has significant impact on the efficiency and productiv

    Jan 1, 2024

  • ISEE
    Explosives Casting Technology in Surface Mining

    By D E. Shaw, J B. Case, J Gusek

    Explosive casting of overburden is defined as the use of explosives in blasting to move overburden to a spoil pile without rehandling. Studies of the economic feasibility of the method, and the formul

    Jan 1, 1980

  • ISEE
    ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine

    By Yong Pan, Purushotham Tukkaraja

    It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose

    Jan 1, 2019

  • ISEE
    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    Fingerprint Verification For Control Of Electronic Blast Initiation

    By Ron Stewart, Richard Youmaran, Andy Adler

    In the current context of heightened concerns with explosives security, there is significant interest in technological controls to improve security. It is important to be able to control what is fired

    Jan 1, 2007

  • ISEE
    Practical and Proven Methods to Control Blast Induced Coal Damage when Blasting Overburden

    A major problem that has continued to plague the surface coal industry is blast induced damage to the coal seam. Atlas Powder Company has addresssed this situation through seven years of field researc

    Jan 1, 1990

  • ISEE
    Statistical Methods Applied to the Analysis of Blasting Vibrations in a Diabase Quarry in the City of Campinas, (SP) - Brazil

    By Milton Barbosa Landim, Denise de La Corte Bacci

    Statistical methods of multiple regression analysis, trend surface analysis and principal components analysis were applied to seismographic data recorded during production blasting at a diabase quarry

    Jan 1, 2002

  • ISEE
    Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case Study

    By Stuart Brashear, Robert Brush, Ben Cook

    In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W.W. Boxley, received a series of complaints from the owners of a 130 year-old historic farmhouse that h

    Jan 1, 1995

  • ISEE
    Comparison of Micro-Inch In-Plane and Out-of-Plane Resoponse of Cracks to Blast Vibration and Weather

    By Jeffrey Meissner, Mike Waldron, Charles Dowding

    Most studies of crack response have focused on opening and closing of a crack in the plane of the wall in which the crack occurs. Crack movement also occurs perpendicular or normal to the plane of the

    Jan 1, 2010

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    Drilling Cost Optimization by Using a Water-Powered Drilling Technique at an Underground Sublevel Stoping Operation

    By Alexandra Yuyali

    The objective of this research work is to increase the drilling ratio represented in tons per drilled meter (ton/m) to reduce mining costs. One of the key characteristics of this research is the use o

    Jan 21, 2025

  • ISEE
    Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock Conditions

    By Luis Huaroc, Jorge Cardenas, José Salvador

    One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents

    Jan 26, 2026

  • ISEE
    Vibration Control at Long Harbour

    By Michael Burrell

    This project involved the protection of an historic landfill located on the site. Construction blasting was for a permanent access road to carry traffic to and from a new metal processing plant being

    Jan 1, 2012

  • ISEE
    HDAN and Gasified Emulsion Blends Improving Blasting at Peruvian Mines

    By Romel Villanueva L.

    "Peru does not produce ammonium nitrate; nevertheless it is a large consumer of both, porous prill (PP) and high-density (HD) varieties. Explosives cost is an important preoccupation in Peru, due tofl

    Jan 1, 2016

  • ISEE
    Underground Blast Monitoring and Rock Mass Anisotropy

    By Jody Todd, Ernesto Villaescusa, Ronald Lachenicht, Kelly Fleetwood

    In the underground environment, characterisation of a rock mass during the mining cycle becomes increasingly difficult due to a lack of rock mass exposure for measurement or observation. In most cases

    Jan 1, 2008

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Limestone Fragmentation Case Study Using Regular Rhythmic Timing

    By Tristan Worsey, Jhon Silva

    The paper discusses a limestone quarry case study that looks at change in fragmentation due to using different charge sequences when using the regular rhythmic timing method.

    Feb 1, 2020

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • ISEE
    Close-In Shockwave Characteristics In Saturated Sand

    By L C. Taylor, H U. Lesiste

    This paper provides a preliminary description of the properties of the output pressure (shock) wave of an end initiated, cylindrical charge of low height to diameter ratio in saturated sand. The prope