Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, Florida

    By Doug Wathen, Philip M. E Thomas

    The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational

    Jan 1, 1996

  • ISEE
    Removal of the Top of an Aged Water Supply Reservoir By Explosives

    By Chuck Kliche, Bill Clements

    This project involved the removal of the top of an old water supply reservoir tank for the City of Lead, SD by explosives. The general contract called for the removal of the concrete top without damag

    Jan 1, 2007

  • ISEE
    Blasting For A Lokotrack System

    By Roger L. Keller

    Cautious, productive blasting is employed in the adaptation of a mobile crushing system extending into a highway through cut. In Hong Kong's final chapter of infrastructure development in preparation

    Jan 1, 1998

  • ISEE
    The Explosives Industry and Governmental Nexus

    By Joshua Hoffman, Rhys Baker, Tim O’Brien

    Numerous agencies in the Executive Branch of the United States Federal Government have regulatory jurisdiction over the explosives industry. These agencies develop the rules by which the explosives in

  • ISEE
    Evaluation of Schedule IV-Type Containers

    By D Wilson, E Nagy, R A. Augsten, R R. Vandebeek, R L. Guilbeault

    The Canadian Explosives Research Laboratory (CERL), is evaluating the status of the Schedule IV explosives container as it presently pertains to the industry. The Schedule IV container serves the same

    Jan 1, 1990

  • ISEE
    Regression Model for Surface Vibrations from Underground Operations

    By Tristan Worsey, Nathan Rouse, Daykin Schnell

    The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li

  • ISEE
    Impact of ROM PSD on the Crushing and Grinding Circuit Throughput

    By Split Engineering Chile Fernando Fernandez

    Mathematical modeling in conjunction with mineral characterization is widely used as a method for design and optimization of comminution circuits, to simulate the processes of crushing, grinding and c

    Jan 1, 2015

  • ISEE
    Bridge Demolition in an Environmentally Sensitive Area

    By Ron J. Elliott, Corry Coumans

    The following is a detailed description of the blasting procedures used in the successful demolition of the Stave River bridge, Mission, British Columbia, Canada. This highway bridge spans a highly se

    Jan 1, 1998

  • ISEE
    An Introduction to the Halo Effect

    By Paul Worsey, Seokbin Lim

    In many high explosive applications, the explosives are covered or clad by a metal. This metal cover may serve a variety of purposes including: 1) to protect and prevent the disturbing or misshaping o

    Jan 1, 2005

  • ISEE
    Modeling Reactive Sulfide Rock at the Red Dog Mine

    By Norman Paley, Zachary Pickett

    The Red Dog Mine is a high-grade zinc-lead mine located in northwest Alaska which began operations in November 1989. In June 2014 the upper half of a charge in a trim shot in the Aqqaluk pit deflagrat

  • ISEE
    Methodologies for Fines Control in Blasting Operations related to Porphyry Cu Supergene Materials

    By Diego Quezada, Carlos Munoz, Marco Arellano

    It is well-know that the presence of fine materials in mining has a direct impact on the plant processes with a great influence in the total amount of ore production and recovery. In Cu mining heap le

    Jan 1, 2010

  • ISEE
    A Linear Interpolation of Vibration Waveforms for Varying Seed Waveform Vibration Modeling

    By Ruilin Yan, Kameron Ray

    This paper reports a simple approach to model the waveform change due to travel distances based on the field measurement. A linear interpolation is used to estimate the waveform at a distance from two

    Jan 1, 2014

  • ISEE
    Time-retarded Chemistry Tweaks Shock/heave Ratio

    By Michael Wieland

    Work-principle computations for explosions underwater or in rock reveal the way the thermodynamic characteristics of surrounding material influence the resulting shock and heave. To reach total thermo

    Jan 1, 2008

  • ISEE
  • ISEE
    Controlled Blasting During the Empress Riverboat Expansion Project

    By Barbara A. Sciever, John H. Sr Schue

    Riverboat gambling has caused quite a sensation among people since its talk of coming to Illinois. The year 1992 marked the start of an era for people that had a penchant for gambling, it was the year

    Jan 1, 1995

  • ISEE
    Utilization of Pre-split to Dewater a Cut

    By Monica Stuckert

    Field studies were made at an Appalachia coal stripping operation to evaluate the differences in cost and performance between blast casting with pre-split dewatering versus conventional coal overburde

    Jan 1, 1985

  • ISEE
    New Containment Methods against Forest-Fires based on the Use of Explosives

    By Winfried Rosenstock, Hans-Jochen Blatte

    "The guidelines of fire-fighting strategies have to be rewritten, latest since theYellowstone-Fire.CF- and S3- procedure are developed to achieve firelines of 500 ms/ h length and 100 mswidth per unit

    Jan 1, 1993

  • ISEE
    "Frequency Adjustment" with High Accuracy Detonators

    By Ken C. Pruss

    Seismic studies have proven that the frequency with which shock or vibration waves are reacting on a structure, in correlation with the amplitude of those waves, has a definite affect of structural da

    Jan 1, 1989

  • ISEE
    Blasting the Aliceville Bridge - a Society Joint Venture

    By E Emery Gray, Gary Ard

    Each year when hundreds of Engineers and Specialists in the explosives industry meet for the SEE Annual Conference, new ideas are exchanged and new business relationships formed. Harbert Construction

    Jan 1, 1981

  • ISEE
    What a Gas: Blasting Under Pressure (8726b99d-0c1c-4f90-bc37-7481da7b7d20)

    By Jerry R. Wallace

    This project consisted of blasting for expansion of a major interstate natural gas transmission pipeline pump station. The pump station handled 400-500 million cubic feet (11-14 million cubic meters)

    Jan 1, 1996