    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin

    By J. Racinais, P. Vincent

    "In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m

    Jan 1, 1900

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)

    By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa

    "Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low

    Jan 1, 2015

  • DFI
    San Diego Courthouse Commons Shaft Shoring And Tunnel Canopy Tubes

    By Ali Nasirian Ph. D., Gabriel Carvajal

    To facilitate the safer and more secure transportation of inmates from San Diego Central Jail to the new San Diego Courthouse, the County of San Diego committed to building a new transfer facility as

    Oct 1, 2022

  • DFI
    Horseshoe Secant Compression Shoring System For Tunnel Repair

    By Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari

    A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten

    Oct 1, 2022

  • DFI
    Jet Grout Underpinning to Support the Waterman Hospital

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t

    Jan 1, 2019

  • DFI
    The Potential Impacts Of Questionable Instrumenation Data

    By Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson

    This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t

  • DFI
    Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower

    By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich

    "The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element

    Jan 1, 2017

  • DFI
    Principles and Soil Mixing Examples of Portland Cement-Based Solidification/Stabilization Treatment

    By Charles M. Wilk

    "Solidification/stabilization (S/S) treatment is used to treat hazardous wastes for disposal and in the remediation/site restoration of contaminated land . SIS is also an increasingly popular technolo

    Jan 1, 2005

  • DFI
    Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, California

    By Michael Forrest, John Roadifer, Glen Gorski

    "The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d

    Jan 1, 2015

  • DFI
    Improvements to Commonly Used Cutoff Wall Specifications

    By Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea

    "Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with

    Jan 1, 2015

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • DFI
    Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure

    By D. Barber, A. D. Miller, P. A. Bray

    The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx

    Jan 1, 2017

  • DFI
    Active Soil Nail Wall Underpinning Solution For The Bruce Museum Project

    By Martin B. Hudson, Andrew K. Cho, Rolff B. Knobel, Les R. Chernauskas, Jonathan L. Ernst

    ABSTRACT The Bruce Museum, located in Greenwich, Connecticut, is home to an extensive display of art and natural history exhibitions. A large addition was designed to be constructed adjacent to the mu

    Oct 1, 2022

  • DFI
    Pullout Capacity of Pile Groups in Sand

    By S. P. Mukherjee, Smita Tung

    "Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i

    Jan 1, 2015

  • DFI
    Signal Anomalies in Crosshole Sonic Logging Testing with a Case Study in Metro Manila

    By Benjamin B. Buensuceso III

    Crosshole sonic logging (CSL) is a popular quality assurance and quality control method used to examine the concrete quality of cast-in place deep foundations, though the evaluation of the results is

    Sep 8, 2021

  • DFI
    Interpretation and Evaluation of Thermal Integrity Profiling Measurements

    By Seth Robertson, Daniel Belardo, Travis Coleman

    Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust

    Sep 8, 2021

  • DFI
    Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, Victoria

    By Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan

    The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an