Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven PilesBy Franklin M. Grynkewicz
The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d
Jan 1, 1991
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
Pressure Injected Footings Mobile Convention Centre - IntroductionBy D. G. Bishop
This paper is intended as a review and update of the use of Pressure Injected Footings as deep foundation units in North America. We will discuss various aspects of this pile and then discuss a partic
Jan 1, 1992
-
The Settlements Of Buildings On Pile FoundationsBy Mait Mets
In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th
Jan 1, 2002
-
Underpinning A Crane FoundationBy Donald R. McMahon
This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man
Jan 1, 2006
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
Optimising the Compressive Behavior of Screw Piles in Sand for Marine Renewable Energy ApplicationsBy Andrew J. Brennan, Jonathan A. Knappett, Lewis Hamilton, Michael J. Brown
"Abstract This paper investigates the compressive behaviour of screw piles in sands and the key design parameters which control this. These types of foundation elements have typically been used as scr
Jan 1, 2014
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Value Engineering of Reinforcement used in Large Diameter Drilled ShaftsBy Shahid Islam, Lucian Bogdan
Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu
Jan 1, 2018
-
The Driven Grout Pile - An Economical Alternative In Pile Foundations ? ScopeBy Brian Langdon
The DRIVEN GROUT PILE was developed in 1989 by DeWitt Construction, Incorporated. This piling essentially consists of a cost-in-place concrete piling that reacts on a steel boot that is driven to bear
Jan 1, 1990
-
Pile Load Testing At JFK International Airport - SynopsisBy J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? SynopsisBy N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Statnamic Load Testing Of High Capacity Marine FoundationsBy Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2005
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996
-
An Improved Method For The Prediction Of Pile Bearing Capacity From Dynamic TestingBy R. T. Stain
Dynamic methods of load testing piles using a drop hammer to generate the input force have been in use for many years. These systems are based on the wave equations developed at the Case Institute of
Jan 1, 1989
-
Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In MarlBy Gregory J. Canivan
Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and
Jan 1, 2002