Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? SynopsisBy Z. G. Lin
In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate
Jan 1, 2010
-
Apportioning Risks On An Urban Deep Foundation ProjectBy Michael P. Balducci
Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr
Jan 1, 2008
-
St Clair River Rail Tunnel, Sarnia Evolution Of The Design And Construction Methods For The TBM Cutterhead RetrievalBy Peter McDonald
In 1994 the world's largest underwater tunnel was constructed to link Canada and the U.S.A. This new tunnel was large enough to accommodate double-decker railway cars. The construction of an unpl
Jan 1, 1997
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
2D And 3D Analysis Of New Austrian Tunnelling MethodBy G. R. Dasari
New Austrian Tunnelling Method (NATM) has been analysed by Finite Element method in two and three dimensions by Strain Dependant Modified Cam Clay (SDMCC) Model. The effects of construction sequence,
Jan 1, 1996
-
Diaphragm Walls Acting As Anchor Curtains Of Laterally Loaded Structures - SynopsisBy J. Matos e Silva
The paper refers two examples of structures located in seismic areas (Cases 1 and 2). The first one (Case 1) is the Torroal Bridge, located about 100 Km South of Lisbon, in the road Troia-Grandola
Jan 1, 1996
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - SummaryBy Basem Sh. Hazzan
In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on
Jan 1, 1999
-
Advantages And Limitation Of Integrity Tests For Large Diameter Bored Piles In Bangkok SubsoilBy Narong Thasnanipan
In Bangkok due to the prevailing condition of subsoil (existence of considerably weak stratum at top part) deep-seated large diameter bored piles of over 50 m depth with 0.8 -1.8m in diameter have bee
Jan 1, 2004
-
A Unique Solution To Mitigate Movement At The Jefferson Memorial SeawallBy Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011
-
Laboratory Study on Creep Behavior of Chemically Stabilised Soft Soils under Unconfined ConditionsBy Venda Oliveira P. J., Correia A. A. S., Danisi C. M.
"AbstractA laboratory study has been undertaken to establish common understanding of the creep phenomenon of a Portuguese soft soil chemically stabilised with binders. In order to study the effect of
Jan 1, 2014
-
Easy Static Load Tests: Expert ResultsBy M. England
Test equipment has been developed to record automatically both the displacement of the pile head and the load applied during a conventional maintained load pile test. Some systems also have, in additi
Jan 1, 2002
-
Effect Of Surcharge Pressures On Excavation Support - Inconsistencies Between Design Calculations And PracticeBy Darrell Wilder
When designing excavation support systems in urban environments, it is often necessary to consider the effect of vertical surcharge loads from adjacent structures. Several methods are used in practice
Jan 1, 2006
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future. (6f8f1933-2bde-4a96-8f8f-131aa6e7971f)By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
Evolution Of Piling Design And Techniques In Mudstone At Manchester AirportBy Colin Curtis
In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is
Jan 1, 2001
-
Construction Of Long Tubular Column Foundations Under Deep Water ? SynopsisBy C. L. Liao
The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter
Jan 1, 2010
-
Shoring And Caissons At The Air Canada Centre/Raptors StadiumBy Dawn C. Tattle
[ ] Panoramic View of Completed Facade Supports The following case history describes the installation of earth retention systems, historical facade supports and structural caissons by Anchor Shor
Jan 1, 1997
-
Formation Of Interlocking Jet Grout Columns At Large DepthBy Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008
-
Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)By Richard J. Finno
This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti
Jan 1, 2010
-
Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm WallsBy B. Sivarama Sarma, Biswabikash Rout
"Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes
Jan 1, 2017