    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • DFI
    Evaluating Geotechnical Resiliency Solutions in New York City

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    When selecting a solution for improving resiliency at facilities, such as airports, utility and transit sites, there are many options to protect structures and equipment against potential flooding. Ea

    Jan 1, 2018

  • DFI
    Interlocking Caisson Walls

    By William E. Lardner

    Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi

    Jan 1, 1987

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • DFI
    New Focus: Environmental Impact Reduction of Proper Slurry Waste Management

    By Zachary Q. Maassen

    The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p

    Jan 1, 2018

  • DFI
    Underpinning With Steel Pipe Piles

    By Pasi Korkeakoski

    There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and

    Jan 1, 2000

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • DFI
    The Construction And Performance Of Prestressed Ground Anchors In Soils And Weak Rocks: A Personal Overview - Summary

    By Donald A. Bruce

    The paper reviews aspects of the construction and performance of prestressed ground anchors installed in soils and weak rocks. Attention is focused on good practice for drilling, tendon fabrication an

    Jan 1, 1991

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Piled Raft Design For High Rise Buildings In East London, UK

    By D. P. Nicholson

    The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South

    Jan 1, 2002

  • DFI
    Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall Performance

    By Reinhard Gnilsen

    Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i

    Jan 1, 1988

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • DFI
    Design Of Augered Cast In Place (ACIP) Piles - Introduction

    By Michael McVay

    The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven

    Jan 1, 1997

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2004

  • DFI
    The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? Synopsis

    By M. Tominaga

    An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco

    Jan 1, 2010

  • DFI
    Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC Region

    By Frank J. Arland

    Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p

    Jan 1, 2004