Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Niobec Mill

    By Michel Robert

    "In 1974, Copperfields Mining Corporation and Soquem formed a new company, Niobec Inc, to bring the niobium deposit of the St-Honore carbonatite into production.St-Honore is located in the Saguenay ar

    Jan 1, 1978

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    The gemological identification of emeralds and blue sapphires

    By J. E. Shigley

    The gemological properties that allow natural emeralds and blue sapphires to be distinguished from other gemstones are summarized in this paper. A variety of synthetic and laboratory-treated emeralds

    Jan 1, 1998

  • CIM
    Strategies for Mining in the Vicinity of the Creighton Fault at Vale?s Copper Cliff Mine

    By Mehdi Razavi

    Scope of the Study The possibility and risk associated with mining two stopes at the same time The influence of Creighton Fault on the stability and dilution The effect of irregular shape of stope

    Oct 1, 2010

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    Error Associated with the Sampling of Gold Ores

    By Raphaël Mermillod-Blondin, Claude Bazin

    "Sampling is an important step for ore body evaluation and daily plant material balances. The Gy’s equation is regularly used to assess the size of the samples to be collected and to estimate the repr

    Jan 1, 2012

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    A Contribution for the Improvement of a Rotary Sample Divider for Iron Ore Concentrates Sampling.

    By M. Poirier, J. H. Mbouche

    "The research question of the present work is the following: at which speed should a rotary sample divider operate in order to produce representative samples of iron ore concentrate? In order to solve

    Jan 1, 2016

  • CIM
    Development of AERO® MX3048 Promoter for MMG Sepon Concentrator, South Central Laos

    By Tony Moore, Peter Riccio

    "MMG (Minerals and Metals Group) operates the LXML Sepon’s mineral processing facility located 40 kilometers north of the town of Sepon, in the Savannakhet Province, Lao PDR. The Sepon copper plant pr

    Jan 1, 2011

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project

    By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton

    "Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub

    Jan 1, 2013

  • CIM
    Control System Performance Assessment-Best Practices

    By Michel Ruel

    "PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo

    Jan 1, 2011

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • CIM
    Environmental Excellence In Exploration (E3)

    The Environmental Excellence in Exploration (E3) project is driven by the recognition that the minerals industry can only maintain its long term viability by ensuring its continued access to lands to

    May 1, 2002