Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Initial Slope Stability Study of Undercut Slope at Area 4.1 Mae Moh Mine, Lampang, Thailand

    By Cheowchan Leelasukseree

    Mae Moh mine, operated by Electricity Generation Authority of Thailand (EGAT), is the largest open pit mine in Southeast Asia. Its production is approximately 15 million lignite tons and 90 million m3

    Jun 1, 2012

  • CIM
    Geology of the Midwest uranium deposit northern Saskatchewan

    By D. E. Ayres, J. Farstad

    "The Midwest uranium deposit is located within the Athabasca Basin near its eastern margin and displays many of the features seen in a number of other similar deposits in this area. The mineralization

    Jan 1, 1986

  • CIM
    In Situ Stress Measurements in a Drilling Hole Penetrated to the Tohoku-Oki Earthquake Fault: Indication of Coseismic Stress Change

    By Weiren Lin

    The Mw 9.0 Tohoku-Oki, Japan earthquake occurred on 11 March 2011 produced a maximum coseismic slip of >50 m near the Japan Trench. To investigate why the plate boundary fault between the subducting P

    Jan 1, 2015

  • CIM
    Suffield Mine

    By Gilles Carrière

    "The Suffield mine is situated five miles southwest of the city of Sherbrooke, in the Eastern Townships of Quebec. lt is the property of Suffield Metals Corporation Limited, a wholly owned subsidiary

    Jan 1, 1949

  • CIM
    Predicting Bubble Coarsening in Flotation Froth: Effect of Particle Size and Hydrophobicity

    By Seungwoo Park, Whuisu Shim, Roe-Hoan Yoon, Kaiwu Huang

    "A comprehensive froth model has been derived from first principles. It is based on predicting the kinetics of film thinning in the presence of particles of varying sizes and surface hydrophobicity. A

    Jan 1, 2016

  • CIM
    Narrow Veins Mining Method (trials and results)

    By Alain Grenier

    To be more competitive, we have to try new mining techniques. A few of them are: extend honghole length increase drilling precision new type of primary opening (slot) use of CMS to extend stope l

    Oct 1, 2001

  • CIM
    Squall Lake Property

    By W. T. Boyes, J. M. Harrison

    "Squall Lake Gold Mines, Limited, owns a group of claims at Squall lake, northern Manitoba, about 75 miles east of Flin Flon and 3 to 4 miles north of the Nor-Acme mine at Snow lake. Gold mineralizati

    Jan 1, 1954

  • CIM
    Sensitivity Study of the Induction Hardening Process

    By S. Sundararajan, J. Brousseau, P. Bocher, M. Galopin, N. Barka

    This research is committed to the prediction of the hardness profile produced by induction heating, using a computer-modeling software. The paper presents the simulation of the induction hardening pro

    Jan 1, 2006

  • CIM
    Recent Developments of the Old Sydney at Princess Colliery Collieries, Limited

    By R. R. Dickson

    Princess colliery, the largest mine operated by the Old Sydney Collieries, Limited, commenced operations in 1877. It was the first mine sunk in the Sydney coal field with the primary object of working

    Jan 1, 1946

  • CIM
    SPLC - A Power Supply for Smelting Furnaces

    By T. Gerritsen, C. Martinez, F. Stober, T Ma, J. R. Frias, M. Sedighy, J. Janzen

    Electrode control systems regulate power by physically positioning electrodes. Due to the weight and inertia of the electrodes and hoist equipment, this is a relatively slow process where power fluctu

    Jan 1, 2005

  • CIM
    Choosing the best fire-suppresant system

    By Lorne Roberts

    "This paper describes: how Falconbridge's fire protection system meets the needs of the Lockerby Mine; why the system was chosen over other alternatives; how it is unique, but can be applied to a

    Jan 1, 1982

  • CIM
    Environmental management from a corporate perspective

    By Henry Brehaut

    "It is difficult to know how much environmental information is absorbed by those in a position to put it to use. The following information may seem like ""old stuff"" to those whose companies are taki

    Jan 1, 1991

  • CIM
    Managing metal price risks

    By Keith C. Hendrick

    "Metal prices are frequently the most critical and least predictable element in determining the profitability of mining operations. Short -term fluctuations can be offset in varying degrees by hedging

    Jan 1, 1983

  • CIM
    The Apex Mine: a case study in small scale underground mining

    By R. W. Guill

    "The Apex Mine is currently scheduled to be brought back into production by Hecla in the first quarter of1990. Its projected productivity rate will be exceptionally high for a small underhand cut and

    Jan 1, 1990

  • CIM
    Carol pellet quality - a decade in review

    By D. Pearcey, S. T. Vessey, V. Hegde, J. Staples

    "Pellet quality has taken on a new dimension during the last ten years. Quality in the seventies was generally defined as adherence to certain physical and chemical specifications. Today, the talk is

    Jan 1, 1991

  • CIM
    Design and operation of thickened tailings disposal system at Les Mines Selbaie

    By K. R. Wood, G. W. McDonald

    "The tailings disposal system at Les Mines Selbaie includes dewatering of tailings in a high-capacity thickener, followed by point discharge of the thickened solids to form a stable conical pile. Tail

    Jan 1, 1986

  • CIM
    Two steps back, three steps forward

    By Robert B. Parsons

    "The new Ontario Liberal government introduced its first budget in October. The changes to The Mining Tax Act proposed in the budget are mean t 10 simplify the current system without any loss of reven

    Jan 1, 1986

  • CIM
    Cu-Au Skarn Mineralization, Minas de Oro District, Honduras, Central America

    By John Drobe, Robert M. Cann

    "Abstract - The Minas de Oro Cu-Au skarn and replacement deposits are located in the highlands of central Honduras, 90 km north-northwest of the capital of Tegucigalpa.The deposits formed in Cretaceou

    Jan 1, 2000

  • CIM
    Quantitative Modeling of a Neutralization and Co-Precipitation Process with Ferrihydite for the Simultaneous Removal of As (V) and Hg(II)

    By S. Hobo, M. Yagisawa, T. Uchida, C. Tokoro, T. Kato

    In this study, quantitative modeling was carried out for the treatment of simulated waste water containing As(V), Zn(II) and Hg(II) as toxic elements, and Fe(III), Na(I) and sulfate as coaxing ions. T

    Jan 1, 2016

  • CIM
    Kinetic Transformation of Nanofilamentary Au Metal-Metal Composites

    By K. Wongpreedee

    Recovery and recrystallization of Au wire can degrade strength and alter conductivity properties during exposure to elevated temperature. Au Deformation Processed Metal Metal Composites (Au DMMC'

    Oct 1, 2003