Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of Genetic Models for Australian Sulphide Nickel Deposits

    Exploration for economic nickel sulphide mineralisation has often been directed by rationalisations based on poorly understood genetic models. Among those that have enjoyed popularity over the pas

    Jan 1, 1972

  • AUSIMM
    Structural Elements in Epithermal Gold Deposits of the Coromandel Peninsula, New Zealand

    By D S. Clarke, K B. Sporli

    Structure is an important control in the localisation of gold mineralisation in epithermal systems. There has been, however, only limited investigation of the structural elements involved; such a stud

    Jan 1, 1990

  • AUSIMM
    Model Study of Gas Flow in Kalgoorlie Nickel Smelter

    The patterns of flow of reaction gases through the flash furnace at the Kalgoorlie Nickel Smelter were simulated in a 1:20 scale model using a flow of water. Particular features of the flow down the

    Jan 1, 1991

  • AUSIMM
    Improvement of Gas Flow in Large Blast Furnace

    By Miyashita T, Yamamoto R, Kishimoto s

    Following considerations of the effect of furnace size on pressure loss, pressure loss in front of tuyeres, gas flow in the lower parts of the furnace, the distribution of the burden and the gas flow

    Jan 1, 1975

  • AUSIMM
    New Zealand Offshore Gold Exploration - The Harvester Project (bcafb7fe-f4fe-443d-a859-746bfe203af9)

    By Corner NG

    A sea bed sampling programme by CRA Exploration Pty. Limited over an area of 12000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area

    Jan 1, 1990

  • AUSIMM
    The Stratigraphic and Metamorphic Sequence of Mount Isa, and Associated Igneous Intrusions

    The stratigraphic sequence west of Mount Isa contains the Judenan Beds, Eastern Creek Volcanics, and May Downs gneiss. It is an incomplete sequence as major north-south faults divide the area into fou

    Jan 1, 1972

  • AUSIMM
    Computer Aided Design and Analysis of Sapan Dalam Open Pit Mine

    By Milawarma E, Cusack C

    The Sapan Dalam coal deposit of Indonesia consists of ten steeply dipping seams with thicknesses varying between 0.1 and 3.5 m and split by shale, clay, silt and sandstone. The area contains four fa

    Jan 1, 1995

  • AUSIMM
    Basic Aspects on Separation of Biological Flocs in Dissolved Air Flotation

    By M Ljunggren, M Lundh

    Dissolved air flotation (DAF) in wastewater treatment as a separation process of submillimetre biological flocs is based on the generation of bubble/floc aggregates. DAF is a complex process but has g

    Jan 1, 2005

  • AUSIMM
    Geophysics of the Honeymoon Well Nickel Deposits, Western Australia

    The Honeymoon Well nickel sulphide deposits are located in the Agnew-Wiluna greenstone belt, about 45 km south of Wiluna. Both disseminated and massive sulphide nickel deposits are hosted by komati

    Jan 1, 1996

  • AUSIMM
    The Copper Deposits of Australia

    Copper was first produced in Australia in 1844, at the Kapunda Mine in South Australia, and, by 18i>0, production exceeded 2,000 tons of copper a year. Output increased ,steadily, reaching a peak o

    Jan 1, 1943

  • AUSIMM
    The Diesel Electric and Compressed Air Central Power Plant of Western New South Wales Electric Power Pty. Ltd.for the Broken Hill Mines

    Broken Hill is situated at an elevation of approximately 1000 ft. above sea-level, on the Barrier Ranges, in the State of New South Wales, Australia. It is approximately 700, 280 and 330 miles from th

    Jan 1, 1932

  • AUSIMM
    A Report to a Visit to Canada and the United States of America (April-July, 1946) to Enquire into the use of Different Types of Aluminum Powder in the Prevention and Treatment of Silicosis, Together with a General Review of the Subject

    Bureau of Medical Inspection, Broken Hill, New South Wales.INTRODUCTIONFor a considerable time it has be3n realised that the pathological changes produced in human lungs by the inhalation of free sili

    Jan 1, 1946

  • AUSIMM
    Dewatering and Environment-Problems of Dewatering in Hungary

    By Horiszt G

    his report is going to point to that the effect of the mining dewatering on the area of Transdanubian Mountain Range has reached a phase when the cost of dewatering and providing damages can serious

    Jan 1, 1988

  • AUSIMM
    Dewatering and geothermal control for the proposed Lihir mine, Papue New Guinea

    About 3km2 of the central Luise Caldera, in which the Lihir orebody is located, is geothermally active wit.lj gas seeps and fumaroles, and in some areas, a water table at boiling point.The proposed mi

    Jan 1, 1994

  • AUSIMM
    Ore Mineralogy of the Tolukuma Epithermal Gold Deposit, Papua New Guinea: Occurrence, Paragenesis and Controls on Formation

    By Leach T

    The Tolukuma Gold Deposit is hosted by metamorphic and volcanic rocks, and igneous intrusions. Dilatant structures for the main veining appear to be provided by post-metamorphic flexure/faulting; syn-

    Jan 1, 1993

  • AUSIMM
    Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.

    This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h

    Jan 1, 1956

  • AUSIMM
    Direct Copper Smelting

    Direct smelting of copper in a single vessel has long been the extractive metallurgist's dream. Such a process offers the important alvantage. of (i) maximum use of the energy available from oxid

    Jan 1, 1985

  • AUSIMM
    Rapid Location of Gold in Polished Sections with a Scanning Electron Microscope

    By Woodcock J. T, Rummel P. H, Sparrow G. J, MacRae C. M

    An automated method, which is believed to be the fastest in the world and which can be used by mineralogically-untrained technical assistants, has been developed for the rapid location of native gol

    Jan 1, 1991

  • AUSIMM
    Ballymoney Lignite Deposit

    This paper presents an overview of the strategy adopted to bring the Ballymoney opencut lignite deposit to an advanced stage of mine design and confidence. Certain aspects of the project differentia

    Jan 1, 1989

  • AUSIMM
    The Use of Stressed Anchors in Open Excavations and Surface Structures

    Where vertical or near vertical faces are required in open excavations in soils and rocks, some form of stabilization of the 'cut is often necessary. Stressed anchors either alone or in combin

    Jan 1, 1971