    Outline of Electrical Plant Layout Mount Isa Mines Ltd

    By Edmonds G. A

    The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a

    Jan 1, 1953

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    Mass Blasting at Elura Mine

    By G Kennewell

    At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp

    Jan 1, 1999

  • AUSIMM
    Findings of Trials to Improve Bolt Installation Quality in Undergronnd Coal Mining

    During the period May to July 2003, East Mine overcored and recovered from goaf edges a total of 55 1.8 metre CVX grade bolts to analyse installation quality. Some 95 per cent of the pneumatically (ha

    Jan 1, 2003

  • AUSIMM
    Sealing of Fissured-Porous Rock during the Construction of Mine Shafts

    Seven papers included in Session 8 of the Third International Mine Water Congress under the heading "Achievements in Mine Water Management & Research" have been reviewed. Only one paper, a case stud

    Jan 1, 1988

  • AUSIMM
    GRD Macraes Limited ù Over a Decade of Sustainable Development in New Zealand

    GRD Macraes Limited, owners and operators of the Macraes and Reefton Gold Project in New Zealand, have taken up the challenge of sustainably producing in excess of 300 000 ounces per annum within five

    Jan 1, 2002

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Achievements in Mine Water Management and Research General Report

    Seven papers included in Session 8 of the Third International Mine Water Congress under the heading "Achievements in Mine Water Management & Research" have been reviewed. Only one paper, a case stud

    Jan 1, 1988

  • AUSIMM
    Mining The Thick Seams Of The South Maitland Coalfield, N.S.W.

    The thick coal seams of the South Maitland field are the only ones in New South Wales which have been worked extensively to heights beyond 3.8 m (nominal "thin" seam height). Under shallow cover o

    Jan 1, 1976

  • AUSIMM
    Trends in real‐time instrumentation and monitoring techniques for tailings dams

    By L Clarkson, D Williams, P Redcliffe, F van der Wal

    This research presents a snapshot and insight into the trends, patterns, and common considerations identified in the current standing of real-time tailings dam monitoring practice. Based primarily on

    Jul 1, 2021

  • AUSIMM
    Mining of the Southern 1900 Orebody at Mount Isa

    By Li T

    Mining of the southern 1900 copper Orebody presented a challenge due to the complex geology, geometry and simultaneous extraction of the nearby lead/zinc/silver orebody. An integrated and co-operati

    Jan 1, 1995

  • AUSIMM
    The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

    By Smith M, Milton T, Pitt G

    High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyc

    Jan 1, 1987

  • AUSIMM
    The BHP Metallurgy Research Facility

    By Hart A. T, Lanigan P. G

    BHP is currently undertaking research into plasma are metallurgical processing at the Central Research Laboratories (CRL), Shortland. The use of high intensity plasma arcs for melting and smelting

    Jan 1, 1987

  • AUSIMM
    A Study of the Hydrochlorination Reactions of the Nickel Segregation Process

    By Young D. R, Webb I. D

    The hydro-chlorination of Fe2O3 and Fe304 has been investigated in the range 850-950¦C in order to elucidate the role of iron in the segregation process for nickeliferous laterites. The kinetics o

    Jan 1, 1987

  • AUSIMM
    Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling (95e85735-3d90-4a78-b6e4-557395ba00bb)

    By Gleadow AJW, Foster DA, Kohn BP, Raza A

    A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the southeastern highlands and along the continental margin of Australia provides

    Jan 1, 1995

  • AUSIMM
    Best Practice Tyre Application Risk Management (TYREARMÖ) at BHP BillitonÆs BMA Goonyella Riverside Mine

    By T Klinge, P Field, N Sugden, D Trenberth

    Mining remains one of the key industries in Australia and many other countries with mineral wealth. In Australia, mining contributes 8.8 per cent to the countryÆs gross domestic product (McKay et al,

    Jan 1, 2003

  • AUSIMM
    The Mechanism of, and Energy Release Associated with Outbursts

    A study is presented of the theoretically possible initiation systems for outbursts and the subsequent propagation mechanism.Previous occurrences of outbursts and their correlation to the theoretic

    Jan 1, 1980

  • AUSIMM
    The Formation of the Quartz-Gold-Telluride Veins of the Emperor Mine, Fiji

    By Walshe JL, Solomon M

    The Emperor vein system lies on the eastern margin of the Tavua volcanic structure. This is of Miocene age and occurs in basalts(the Mba Volcanics) probably underlain at about 2 km by calcite-rich

    Jan 1, 1987

  • AUSIMM
    Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude

    By R McIlwraith, B Breul

    Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities

    Jul 27, 2015

  • AUSIMM
    Big Diameter Tunnelling Beneath Low Rock Cover

    By N McKenzie, F Brodbeck

    The North-South Bypass Tunnel is the first project to get underway as part of BrisbaneÆs transport plan, which aims to improve the urban road network. The total length to be excavated is 6.8 km, which

    Jan 1, 2008