Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The New Iron and Steelmaking Process at New Zealand Steel

    This paper describes the new iron and steelmaking process recently commissioned at NZ Steel. Ironsand mined and concentrated at Waikato North head is slurry pumped 18 km to the company's Glenbroo

    Jan 1, 1986

  • AUSIMM
    A Multi-year Assessment of Landform Evolution Model Predictions for a Trial Rehabilitated Landform

    By G Hancock, J Lowry, T Coulthard, W Erskine, M Saynor

    An important part of planning for the rehabilitation of uranium mine sites is the ability to assess the geomorphic stability of the final landform, over time frames ranging from decades to millenia. D

    Jul 16, 2014

  • AUSIMM
    Investigation of Shield Face Stability by Transparent Soil Models

    By M Ahmed

    Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u

    Mar 8, 2011

  • AUSIMM
    Microbial Aspects of Environmentally Benign Iron Ore

    Many types of micro-organisms inhabit iron ore deposits contributing to biogenic formation and conversion of iron oxides and associated minerals. Bacteria such as Paenibacillus polymyxa are capable of

    Jan 1, 2009

  • AUSIMM
    The irrefutable value of introducing a dynamic transport term into mill modelling

    By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell

    It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand

    Aug 24, 2022

  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    Current Studies of Practical Rock Mechanics in Underground Mining in Australia

    By K J ROSENGREN

    Underground rock mechanics was initiated as a formal discipline in Australia by early studies for underground structures for the Snowy Mountains Scheme in the 1950s. These techniques were quickly e

    Jan 1, 1992

  • AUSIMM
    Reduction of Mechanical Entrainment by Polymer Depressants

    By Y Peng, D Wannas

    In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl

    Jan 1, 2005

  • AUSIMM
    Underground Mining and Water Management

    By C J. Moran

    All mines face water management challenges. Adopting leading practice water management strategies can help reduce both operational and strategic risks. While many of the water issues faced by undergro

    Mar 21, 2011

  • AUSIMM
    Telfer Commences Underground Mining - A Case Study

    Newmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main

    Jan 1, 1991

  • AUSIMM
    Characterisation of Glassy and Heterogeneous Cementing Phases of Municipal Solid Waste of Incineration (MSWI) Bottom Ash

    By R Badreddine, J Rose, L De Windt, P Chaurand, L Raimbault

    Municipal solid waste of incineration (MSWI) bottom ashes are recycled as aggregates in civil engineering. These heterogeneous materials are composed of crystalline and glassy solid phases which conta

    Jan 1, 2008

  • AUSIMM
    Strategy and Tactics Implemented to Achieve Energy-efficient Ventilation and Cooling of Mines

    By J J. L du Plessis

    Escalating energy and electricity costs have become one of the biggest expenditure drivers in mining operations. During the last eight years, energy costs have trebled when expressed as a percentage o

    Aug 31, 2015

  • AUSIMM
    A Water Accounting Framework for the Australian Minerals Industry

    By C J. Moran

    Given that the mining industry is committed to sustainable development principles and that Australia is experiencing changes to the regulatory environment that aim to modernise the water sector and en

    Jan 1, 2009

  • AUSIMM
    Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework

    By M W. N Buxton, M S. Shishvan, J Benndorf

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 24, 2014

  • AUSIMM
    Development of the Hawsons Low-Grade Magnetite

    By R L. Koenig

    The rediscovery and recognition of the magnetite potential of the iron mineralisation at the Hawsons Project area 60 km south of Broken Hill has the potential for the development of a new series of ma

    Jul 11, 2011

  • AUSIMM
    On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical Parameters

    By K G. van den Boogaart, M Lehmann, U Mueller

    Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula

    Nov 24, 2014

  • AUSIMM
    Isasmelt - A 250 000 TPA Copper Smelting Furnace

    MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ

    Jan 1, 1998

  • AUSIMM
    Gold Mining and Exploration in South America -- An Overview

    Gold mine production in South America was 247.3 tonnes in 1995 up from 156.4 tonnes ten years earlier in 1986. This represents a 58 per cent increase and amounted to 11 per cent of total world gold mi

    Jan 1, 1997

  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum (c8b2fb36-9e9c-4e1a-916e-c8ad62e78d93)

    By Pigdon SP, Anderson RM

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses

    Jan 1, 1998