Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Low-Density Ammonium Nitrate Fuel Oil To Improve Gold RecoveryBlasting in a gold mine has to satisfy the following set of techno economic conditions: good fragmentation, minimum stopped width, minimum number of rock falls, cost effectiveness. Results of a comp
Jan 1, 1995
-
Tests on the beneficiation. of coal finesBy H. C. Voges
An account is given of the tests being conducted by Iscor on the following processes for the beneficiation of coal fines: froth flotation, gravity separation, heavy-medium separation, and pneumatic an
Jan 1, 1991
-
Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote LocationBy P. A. P. Fouché
Processing confidence for a bankable feasibility study on a green field heavy mineral deposit is inmost cases achieved only through bulk sample processing. Bulk sample is classified as a large enough
Jan 1, 2007
-
Spotlight on the 1983 Mining SchoolBy C. L. Workmann Davies
Underground transport and communication in collieries was the theme selected for the 1983 mining school conducted by The South African Institute of Mining and Metallurgy. The response from the industr
Jan 1, 1983
-
"Decomposition Of Metal Sulfates - A SO2 -Source For Sulfuric Acid Production" - Abstract and IntroductionThe peak in Sulphur price late 2008 caused again intensified investigation into the decomposition of sulphates and spend acid. One option is the recycling of sulphur from spend acid, which already sta
Jan 1, 2009
-
"Decomposition Of Metal Sulfates - A SO2 -Source For Sulfuric Acid Production" - Abstract And IntroductionThe peak in Sulphur price late 2008 caused again intensified investigation into the decomposition of sulphates and spend acid. One option is the recycling of sulphur from spend acid, which already sta
Jan 1, 2009
-
Long-Term Mine Production SchedulingBy G. C. S. Burns
"A system has been developed to simulate the mining of the Mufulira orebody. The main output from the system is a picture-gram from which the start date and effective life of all proposed mining faces
Jan 1, 2014
-
Geotechnical areas to facilitate intelligent mechanized miningBy M. W. Grodner, J. Maaren, G. Guler, J. K. Schweitzer
The selection of the most suitable mechanized mining strategy has to consider the geotechnical environment in which it will be operating. A mechanized mining method or machine is designed to a given s
Sep 1, 2001
-
Evaluation Of The Influence Of Grout Prestressing Systems On The Performance Of Timber Packs: Static And Dynamic ConsiderationsA method is proposed for the evaluation of the influence of grout prestressing systems on the support resistance offered by timber packs. It is shown that, in order not to reduce the load-carrying cap
Jan 1, 1996
-
Differential Flotation of Copper-Zinc at Prieska Copper Mines (Pty) Limited: a Preliminary ReportBy S. K. De Kok
Over a period of three years, since samples first became available, laboratory and pilot plant experiments have been conducted to develop a method of treatment to recover copper and zinc in saleable g
-
The Functional Relationship Between Dust Hazard and the Rate of Collecting Funds to Pay Compensation for PneumoconiosisBy R. S. J. Du Toit
SYNOPSIS This paper is based on a thesis dealing with the problem of basing the current rate at which money is collected from mine owners to pay compensation for pneumoconiosis in the future, on the
-
Short-term gain for long-term pain how focusing on tactical issues can destroy long-term value - SynopsisBy B.E. Hall
Maximizing shareholder value has become a common aim for mining companies. This paper discusses the results of a number of studies developing strategic mine plans, covering a wide range of commodities
Jan 1, 2009
-
Calculation Of [?] And [s] ; Auxiliary Functions And Graphs - 6.1 General[The following notations will be used: O an ore body. W a sample of size w located in O; the size of this sample. W a block or a sample, of size W, located in O; the size of this block or sample.
Jan 1, 1978
-
Opening Address Of The XV CMMI CongressBy H. Scott-Russell
Ladies and Gentlemen. It is my great pleasure on behalf of The South African Institute of Mining and Metallurgy and The Geological Society of South Africa to welcome you to the 15th CMMI Congress an
Jan 1, 1994
-
An improved method for the determination, by a MINSIM type of analysis, of stresses and displacements around tabular excavationsBy J. A. C. Diering
The determination of stresses and displacements close to tabular excavations is of considerable importance in the planning of tunnels and of remnant and pillar layouts. This paper gives a description
Jan 1, 1980
-
The influence of superhardening and alloy modification on the reversible temperembrittlement behaviour of Iow-alloy steelBy G. Peinaar
Superhardening is a new development by which a substantial increase in hardenability above the normal can be achieved in Iow-alloy steels. This paper concerns the reversible temper-embrittlement behav
Jan 1, 1984
-
The Efficiency of Wemco Drums at Kleinkopje Coal Washing Plant Over 30 YearsBy T. T. Matuludi
Kleinkopje Colliery has five Wemco drums that were installed and commissioned in 1978. Over the years, there have been remarkable changes in mining and geological conditions at the colliery. First, an
Jan 1, 2010
-
A Rapid Method of Calculating Temperature Increases along Mine AirwaysBy A. M. Starfield
SYNOPSIS A description is given of a new computer programme that has been developed for the rapid computation of the changes in temperature and humidity of air passing through mine airways. The progr
-
The recovery of sulphur, from residues uranium, and goldBy F. Botha, J. S. Adams, W. T. Ruhmer
The report describes the Amuran project in the Welkom area, which is being conducted by six members of the Anglo American Group. The project comprises three plants for the flotation of pyrite, a twin-
Jan 1, 1978
-
An Analytical Solution to the Batch-Comminution EquationBy R. P. King
An Analytical Solution to the Batch comminution Equation R. P. King, Pr. Eng., B.Sc. (Eng.), M. Se. (Eng.), Ph.D. (Visitor). An analytical solution to the batch-grinding equation is presented in terms