    Drilled Shaft Design Optimization by Means of Static Load Testing

    By Riad Diab

    In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th

    May 1, 2022

  • DFI
    Micropile And Soil Nail Load Transfer Rates In The Puget Sound Region Of Washington State

    By Carole L. B. Mitchell

    The increased use of micropiles and soil nailing presents a growing database of verification and sacrificial load test data. In Washington State, the use of micropiles is becoming common, and soil na

    Jan 1, 2006

  • DFI
    Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - Synopsis

    By John A. Dal Pino

    This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th

    Jan 1, 1996

  • DFI
    Defective Piles In Clay - Synopsis

    By S. Narasimha Rao

    Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin

    Jan 1, 1996

  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis

    By T. Soejima

    In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me

    Jan 1, 2010

  • DFI
    Jet Grouting And Safety Of Tuttle Creek Dam

    By Timothy D. Stark

    Jet grouting has increasingly become a ground improvement technology used to address seepage concerns and provide strength improvement to soils underlying dams. The technique of jet grouting uses high

    Jan 1, 2012

  • DFI
    Machine Foundation Repair

    By Scott D. Thomson

    The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of

    Jan 1, 2003

  • DFI
    Influence Lines For The Pile Loading On Bridge Pier Foundations

    By M. B. Wechsler

    An analysis is developed for determining the maximum loading, as well as the potential uplift of the piles on bridge pier foundations. There are considered piers supported on two through seven rows of

    Jan 1, 1989

  • DFI
    Kinematic Load Tests On A Model Pile In Clay

    By Michael J. Brown

    Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and

    Jan 1, 2002

  • DFI
    Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development Projects

    By K. Viking

    This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and

    Jan 1, 2013

  • DFI
    Experimental Evidences From A Pile Load Test On A Driven Composite Pile

    By A. Garassino

    A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe

    Jan 1, 1991

  • DFI
    Davison Freeway Reconstruction Utilizes Design/Build Retaining Walls

    By Thomas C. Anderson

    Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,

    Jan 1, 1999

  • DFI
    Critical Evaluation of Indian Standard for the Design of Laterally Loaded Piles

    By Sanket Rawat, Ravi Kant Mittal, Vikash Prasad

    "The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p

    Jan 1, 2017

  • DFI
    Research on the Influencing Factors of Driving Super Long Piles in Bohai Gulf

    By Liu Run, Jia Zhao-lin, Yan Shu-wang

    "Piles with diameter larger than 2m in engineering can be defined as large diameter pile, and piles used for oil platform foundation in Bohai Gulf, are usually over 100m long and 2m in diameter. Such

    Jan 1, 2014

  • DFI
    Present Developments In The Design Of Deep Foundations

    By Rolf Katzenbach

    The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the

    Jan 1, 2006

  • DFI
    Driven Pile Cost Comparison For Two Large Wisconsin Dot Bridge Projects

    By Van E. Komurka

    This paper presents a cost comparison of the driven pile foundations for two large Wisconsin Department of Transportation (?WisDOT?) projects in Milwaukee, Wisconsin: the Marquette Interchange South L

    Jan 1, 2009

  • DFI
    Load Test On A Model Pile Driven Into Sand ? Summary

    By A. Mazzucato

    This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.

    Jan 1, 2010

  • DFI
    Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge

    By Brian J. Olson, Kevin Haiar

    Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re

    Sep 8, 2021