Research on the Influencing Factors of Driving Super Long Piles in Bohai Gulf

Deep Foundations Institute
Yan Shu-wang Jia Zhao-lin Liu Run
Organization:
Deep Foundations Institute
Pages:
13
File Size:
353 KB
Publication Date:
Jan 1, 2014

Abstract

"Piles with diameter larger than 2m in engineering can be defined as large diameter pile, and piles used for oil platform foundation in Bohai Gulf, are usually over 100m long and 2m in diameter. Such long piles have to be manufactured by segments before installation, because of transformation and hoisting difficulties. The segments of the pile are assembled by welding during installation one to another. Normally, assembling two pile segments takes one day or even a longer time, which mainly depends on construction conditions. After pile segment assembling, it proves to be difficult to restart the successive penetration. The mechanism of pile refusal is discussed and the process of driving a segmented pile is simulated with a finite element program. The calculating results show that, when the stick-up stability was satisfied, increasing the length of the last segment of the pile and assembling the pile segments when the pile tip penetrates into a clay layer could greatly ease the difficulty of driving the pile. Furthermore, cutting down the pile extension time is also one of the most effective measures to minimize the refusal risk.1. InstructionIn recent years, more and more oil platforms with six or eight legs have been adopted in Bohai Gulf, China. The leg piles with diameters of 2m or more have to be driven to about 100m below the sea bed. Such long piles have to be manufactured by segments before installation, because of transportation and hoisting difficulties. The segments of the pile will be assembled during installation, in which a successive segment will be attached to a formerly penetrated one by welding (Fig.1). The assembling work often takes one day or even a longer time."
Citation

APA: Yan Shu-wang Jia Zhao-lin Liu Run  (2014)  Research on the Influencing Factors of Driving Super Long Piles in Bohai Gulf

MLA: Yan Shu-wang Jia Zhao-lin Liu Run Research on the Influencing Factors of Driving Super Long Piles in Bohai Gulf. Deep Foundations Institute, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account