Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock ConstructionBy Roy Peratrovich
An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti
Jan 1, 1985
-
Argosy Casino Expansion: Open Cell Sheet Pile® Harbor ProjectBy Michael Lane
With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes
Jan 1, 2008
-
Non-Destructive Testing Methods For Drilled Shaft And Acip PilesBy George Piscsalko
There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me
Jan 1, 2011
-
Innovative Methods for Underground Parking in Central CitiesBy Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu
"Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni
Jan 1, 2017
-
Deep Vibrocompactation By Stone Columns And Liquefaction InvestigationBy P. Ventura
Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde
Jan 1, 1989
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? SynopsisBy D. Goossens
Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the
Jan 1, 1996
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? SynopsisBy N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate ProjectBy Frank Rausche
Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality
Jan 1, 2006
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial DepositsBy Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And SuccessesBy John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at
Jan 1, 2011
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place PilesBy Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
Interlocking H-Sections For Cofferdams Resist High PressureBy Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational StructureBy Lawrence P. Goldfarb
The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center
Jan 1, 2009
-
Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? SynopsisBy B. B. Broms
The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method
Jan 1, 2010