Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blast Optimization from Drone ImageryBy Markus Pötsch, Andreas Gaich
Optimization of surface blasting based on 3D models from drone imagery and a closed loop that starts with an automatic analysis of the geometry and the geological conditions and ends with an objective
Feb 1, 2020
-
Application of Underground Pre-Splitting in Butte, MTBy M. Gebhardt, J. Johnson, S. Rosenthal
The use of presplitting applications in an underground mine setting is a method of reducing overbreak in the rib and back when blasting occurs. Presplitting performed at the Underground Mine Education
Jan 1, 2024
-
Danger Tree Blasting In BCBy Dave Weymer
Falling timber in BC has always been a hazardous job. Huge, often rotting trees and steep, rugged terrain combine to create difficult and dangerous conditions. Death and injury rates are among the hig
Jan 1, 2013
-
Journal: 100 Years / As you can see above, the title of these articles includes the words “More or Less.” In this issue I’m going to take advantage of that, and print a few things that I’d never be able to share if I adhered strictly to the “100By Robert Hopler
GEO. M. MOWBRAY’S REFRIGERATOR CAR FOR THE SAFE CONVEYANCE OF EXPLOSIVES. It is a fact well known to all miners who have used nitro-glycerin, or any of its adulterations, commonly known as dynamite, r
Jan 1, 2011
-
Safety Challenges of the '90sBy Milos J. Bila
I would like to discuss today several safety topics that we at Nobel feel are going to be particularly critical to all of us who are involved in the manufacturing, transportation, storage and use of c
Jan 1, 1992
-
Vibration Criteria for Surface Mine Blasting: Ten Years after Bureau of Mines R1 8507By David E. Siskind
In the early 1980's, the Bureau of Mines published four reports of structural response and damage from surface mine blasting, vibration monitoring, and analysis methods. These findings replaced simple
Jan 1, 1991
-
Blasting-Concern for Neighbors and OperatorsBy Kris Shukla
Noise and vibration produced by blasting generate curiosity and concern from neighbors. Experiments conducted in Sweden, Canada and U.S.A. have established that fine cracks in the plaster--the weakest
Jan 1, 1978
-
Considerations in Pre-Split Blasting for Mines and QuarriesBy J Lyall Workman, Peter N. Calder
"Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.
Jan 1, 1993
-
Seismic Monitoring of Production BlastsBy Klaus G. Hinzen
Seismic observations offer the only possibility for remote sensing of physical processes like shock-front spreading, material crushing and ground movement. A better understanding of these processes wi
Jan 1, 1989
-
Perimeter Blasting with the ANFO-Spoon TechniqueBy Larry Ng, Keith McDonald
The benefits of controlled blasting techniques have gained increasing recognition by the mining industry in recent years. The utilization of an effective controlled blasting programme can result in a
Jan 1, 1994
-
OSM Blaster Training Modules for Western Coal Mines and QuarriesBy Cory Loukides, Cathy Aimone-Martin
Blaster training manuals used by the Office of Surface Mining (OSM) and others are outdated and cumbersome. A new approach has been developed using Microsoft PowerPoint with a Visual Basic overlay to
Jan 1, 2004
-
Implementation of Blast Vibration Frequency Control Technology at R & F Coal CompanyBy Doug Johnson
This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a
Jan 1, 1988
-
ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus TestsBy E. Contestabile, B. von Rosen, P. Lightfoot
As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the
Jan 1, 2001
-
Explosives Casting Technology in Surface MiningBy D E. Shaw, J B. Case, J Gusek
Explosive casting of overburden is defined as the use of explosives in blasting to move overburden to a spoil pile without rehandling. Studies of the economic feasibility of the method, and the formul
Jan 1, 1980
-
Vibration Control at Long HarbourBy Michael Burrell
This project involved the protection of an historic landfill located on the site. Construction blasting was for a permanent access road to carry traffic to and from a new metal processing plant being
Jan 1, 2012
-
MS Initiation, a Possible Risk in Blasting Tall StructureBy Bob de Raadt
After a review of the general principles for blasting stacks, the stagnations of two stack demolitions are investigated. The author concludes and demonstrates that MS-delay blasting can be risky under
Jan 1, 1982
-
Improving Blast Preformance with High Density Toe LoadsBy John Floyd, Larry Wardrip
A series of tests were conducted to evaluate the performance of a high density, high velocity cartridged explosive. The tests included two production blasts in a limestone quarry and two production bl
Jan 1, 2002
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power PlantBy Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001
-
ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMineBy Yong Pan, Purushotham Tukkaraja
It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose
Jan 1, 2019
-
The 8 Millisecond Rule is Dead – Or Is It?By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley
The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t
Jan 21, 2025