Site Specific Study for Foundation Design of Iswar Gupta BridgeBy Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath
"Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig
Jan 1, 2015
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite BedrockBy Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South AmericaBy Daniel Magill, Jim Gentry
"Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
Jan 1, 2017
-
Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Pre-engineered Hydraulic Bracing SystemsBy Braxton P. Erbe, Douglas C. Brunot
A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy
-
Jet Grout Underpinning to Support the Waterman HospitalBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
The Potential Impacts Of Questionable Instrumenation DataBy Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
Influence of Different Parameters on the Behavior of Laterally Loaded Piles in SandBy Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi
Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under
Jan 1, 2017
-
Impact Of Groundwater Flow On Design Of Open Underground ExcavationBy Heman Manchanda, Sandeep Sharma
Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen
Sep 1, 2022
-
Execution of Pile Installation in Environmentally Challenging SitesBy Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in
Sep 8, 2021
-
Injecting Sustainability into Deep Soil Mixing ProjectsBy Paul R. Lear
Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi
Sep 8, 2021
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage BarrierBy A. David Miller, Douglas M. Barber
"The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust
Jan 1, 2015
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Construction of High Road Embankment over Thick Soft Silty Clay- A Case StudyBy R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Numerical Analysis in Assisting Crane Pad Design and Underground Utilities EvaluationBy Yazen Khasawneh, Yao Zhang
Upgrading and maintenance programs were proposed at a power generating plant in Indiana. To perform construction activities associated with the proposed upgrading and maintenance, a LR11350 crawler cr
Jan 1, 2019
-
Dam Wall Toe Stabilisation Using Mass Soil Mixing TechniquesBy David W. Martel, Tom George
"As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac
Jan 1, 2015
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way LimitsBy Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019