Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017

  • DFI
    Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary

    By Per Eriksson

    For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m

    Jan 1, 2000

  • DFI
    Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary Displacement

    By Lewis Stansfield

    A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie

    Jan 1, 2000

  • DFI
    Present To Future Design Considerations Of Deep Foundations ? 1. Introduction

    By William S. Gardner

    It is certainly an honor to have been invited to address the Deep Foundation&apos;s Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac

    Jan 1, 1991

  • DFI
    The Determination Of The Property Index Of Stabilizing Agent And Computer Simulation For The Optimum Mix In Deep Foundation Construction

    By Li Huimin

    In this paper the step of determining the property index and the program of mixture ratio design of stabilizing agent in deep foundation construction are presented. According to the principle of compu

    Jan 1, 1991

  • DFI
    Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - Summary

    By Madan B. Karkee

    The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid

    Jan 1, 1997

  • DFI
    Driven Piles

    By S. Merjan

    Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf

    Jan 1, 1991

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
  • DFI
    Basement Excavation: Cost Effective Retention System for a Multi Storeyed Structure

    By Madan Kumar Annam, Hari Krishna Y

    "Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted

    Jan 1, 2015

  • DFI
    Maritime Structures

    By D. Waite

    The Chairman opened the session by wondering why so few papers on Maritime Structures had been received for this conference. Perhaps because the marine environment is so hostile and the access so diff

    Jan 1, 1991

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case History

    By Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero

    "SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m

    Jan 1, 2014

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001

  • DFI
    Recent Developments In The Law Of Deep Foundations

    By Brian P. Waagner

    Construction law in general and the law of deep foundations in particular continues to develop rapidly, particularly in the areas of risk allocation. Public and private owners are increasingly using c

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • DFI
    Performance Based Seismic Retrofit Design of Brooklyn Basin Wharf

    By Sam Yao, Ali Naeem, Sara Barrett

    Brooklyn Basin Project is a multi-billion-dollar development of the former Port of Oakland 9th Avenue Terminal located along the Oakland Estuary of California. A centerpiece of the development is the

    Jan 1, 2018

  • DFI
    A Case Study On Underreamed Piles ? Synopsis

    By Rajesh Minda

    160 numbers of double bulb underreamed piles were constructed based on the safe loads specified in IS code at Tripura. The pile load tests yielded a much lower capacity. A detailed investigation work

    Jan 1, 1996

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018