Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast HoleBy Lifent Li, Jhon Silva-Castro
Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init
Jan 1, 2015
-
Non-Electric Shock Tube and Optimizer Initiation Systems, Applications and HookupsBy Tom Treleaven
This guide presents numerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide quick reference by number of decks or bunch
Jan 1, 1997
-
Slope stability through the application of low-energy explosives technologyBy Jorge Cárdenas, Diego Gamarra
In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they
Jan 21, 2025
-
Missouri S&T Experimental Mine Expansion and Associated Risk Safety AnalysisBy Patrick Cahill, Jacob Miller, Nolan Mundwiller, Catherine Johnson
"The Experimental Mine at the Missouri University of Science and Technology is undergoing major developments. The underground workings are being expanded to include a ramp down to a second level which
Jan 1, 2017
-
The Testing of Structures and Structure-combinations to be Applied as Explosive-proof EnclosureBy C. Heiss, A. Hofmann
Due to an explosion in an Austrian steel works during the basic oxygen process, the Chair of Mining Engineering and Mineral Economics at the Montanuniversitaet Leoben was assigned with the set-up of a
Jan 1, 2012
-
Blasting, Material Flow & Ore Dilution in Sublevel Cave Mining; State-of-the-Art ReviewBy Ayman Tawadrous
Cave mining offers a flexible technique to exploit large, low grade, deep ore bodies with low operating costs. It is typically done in either a top down approach; i.e. sublevel caving, or in a bottom
Jan 1, 2015
-
Moving 50’(15.3m) of Burden with a 4½” (115mm) HoleBy Keith Henderson
An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall
Jan 1, 2012
-
Demolition Using Water-Cased Kicker ChargesBy Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel
Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte
Feb 6, 2023
-
Advance Blasting using Drone Mapping and AI for Comprehensive Blast Performance AnalysisBy Dr. Anurag Agrawal, Fathur Rozaq, Nella Lubis, Relinda Sanistya, Herry Saputra, Rudolf Sitorus
In mining operations, basic drone applications such as pre- and post-blast photo comparisons, blast video recordings, and sample-based fragmentation analysis are often used to assess blast performance
Jan 21, 2025
-
An Empirical Method of Comparing Brisance of Various Bulk ExplosivesBy Neal Lee, Braden T. Lusk, Brendan McCray
"Selection of a blasting agent for optimum performance is based on many variables. Often, a decision is made with regard to product cost and field testing. Defining optimum performance can be difficul
Jan 1, 2017
-
Underwater Blast Pressures From A Confinded Rock Removal During The Miami Harbor Deepening ProjectBy Terri Jordan, Gregory Hempen, Thomas Keevin
Water-borne blast pressures from confined blasts were recorded as part of a submerged blasting program in Florida for channel deepening. The blasting was confined within the rock floor by stemming. Sh
Jan 1, 2007
-
Using New Technologies to Achieve Customer Tailored FragmentationBy Felix Degold, Mark Ganster
Achieving a customer optimized fragmentation by using robust data from new technologies e.g. GPS positions of boreholes, fragmentation analysis to calibrate the geology and fragmentation prediction mo
Feb 1, 2020
-
Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion ProductBy Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs
Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g
Feb 6, 2023
-
Journal: 100 Years / The Piercing of The Simplon The Century Magazine New York June 1905 / Driving Headings in Rock TunnelsBy Robert Hopler
THIS paper deals specifically with heading-driving as distinguished from the broader term tunnel-driving. A heading is a pilot or path-finder for the main tunnel. Some headings are complete tunnels in
Jan 1, 2010
-
Urban Tunneling for the MWRA's Boston Harbor Clean UpBy Gordon C. Petersen, Gary A. Almeraris
This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe
Jan 1, 1991
-
Mitigation of Accelerations on Vehicles Subjected to Buried Mine LoadingBy Jarrod Bonsmann, Zachary T. Plitt
"A surge in mine related deaths in Middle Eastern conflicts over the past few years has prompted research into the mitigation of the impact on a blast loaded vehicle. In past military conflicts, it ha
Jan 1, 2016
-
Study of Ultrafines Control in BlastingBy A. Andrades, E. Arias, Y. Pizarro, J. Alarcón
Division Ministro Hales - Codelco (DMH) is located at 2600 meters above sea level, 10 km north of the city of Calama, Antofagasta region, Chile. In operation since 2010, it corresponds to a porphyry
Jan 1, 2024
-
Correlating Near-Source Damage from Single-Hole Explosions to Seismic WavesBy Randy Martin, Jessie Bonner, Peter Boyd, Mark Leidig, Timothy Rath
We conducted the Vermont Damage Experiment in central Vermont during July 2008. Five single-hole explosions with yields ranging from 60.8 kg (134 lbs) to 122.5 kg (270 lbs) were detonated in homogeneo
Jan 1, 2010
-
Effect of Presplit Perimeter Control in an Underground Cut and Fill MineBy David Porter, Nathan Rouse
The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders
Feb 6, 2023
-
Drilling on the Taum Sauk Upper Reservoir Rebuild ProjectBy Randall Head
The drilling at the Taum Sauk Reservoir was a unique compilation of the latest technology and everyday common sense. This site is comprised of rhyolite, which is 30 times harder than limestone in comp
Jan 1, 2010