Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Effect of Charge Mass and Delay Timing on Airblast Overpressure
By Adrian Moore, Dominic Hooton, Alan Richards
Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m
Jan 21, 2025
-
The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey
By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer
The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi
Jan 1, 2010
-
New Methodology for Calculating Dynamic Pressure
By Jorge Cárdenas, José Luis Hurtado
The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar
Jan 21, 2025
-
Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada
By Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
Ring Blasting Design Modeling and Optimization
By María Rocha, Benjamín Cebrián, Roberto Laredo
"Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all
Jan 1, 2017
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines
By Reinhold Daykin, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove
Feb 1, 2020
-
Hole Diameter: Does it Affect Vibration Attenuation?
By Tyler Acorn, Paul Worsey, Nathan Rouse
The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr
Jan 1, 2013
-
Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit Mine
By Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez
The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain
Feb 1, 2020
-
A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects
By Robert Lee, Pertti Paavola
Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in
Jan 1, 2004
-
Tunneling in Thinly Foliated Rockmass Conditions
By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Use of Electronic Initiation System in Urban Shaft Sinking Project
By Richard Turnbull, James Purssey
"The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be
Jan 1, 2017
-
Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam
By Jennifer Williams, Donald J. Berger
Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of
Jan 1, 2014
-
Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity
By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang
A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr
Feb 1, 2020
-
Rational Methodologies for Setting Blast Vibration Limits for Houses
By Adrian Moore, Alan Richards
"It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb
Jan 1, 2013
-
EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and Quarries
By Matthew Clay, Colin Chambers, Susan Hookham
Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed
Jan 1, 2017
-
The Specifications said No Blasting
By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz
This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci
Jan 1, 2012
-
A New Method of Reactive Ground Testing
By Gary Cavanough
The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de
Feb 6, 2023
-
Explosion Hazards and Quantity-Distance Regulations – A Review of their Physical Basis
Currently there exist several explosive quantity-distance (Q-D) rules variously exercised by most countries to protect personnel and property against the effects of accidental explosions. These regula
Jan 1, 2011
-
Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control
By Peter Dare-Bryan, Will Hunt, Lee Julian
It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule
Feb 6, 2023
-
Quantifying Shovel Performance Through Blast Pattern Boundaries
By K. Taylor
In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera
Jan 1, 2024