Foundation Contracts And Law - Part -1: Relevan[i] LawBy Kirty Dave
Foundations in any contract are the most uncertain parts of the contract and most of the "Construction-Contract-Disputes" are either directly related to foundations or arise as 'Side-effects of c
Jan 1, 1996
-
Instrumented Pile Load Tests In The Area Of Pearl Harbor, HawaiiBy John Y. L Chen
This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex
Jan 1, 2002
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Measuring The Soil-Structure Interaction Of Laterally Loaded PilesBy Muhannad T. Suleiman
The design of deep foundations supporting heavy buildings, bridges, transmission lines, and highway structures, is governed by lateral loads in many cases. However, due to the use of empirical or semi
Jan 1, 2011
-
Compaction-Induced Lateral Earth Pressures And Vertical Shear Forces Acting On Non-Moving Retaining WallsBy George M. Filz
Restrained basement walls and unrestrained but massive concrete walls on rock foundations experience very small movements in response to lateral earth pressures. Such walls are often designed using at
Jan 1, 2003
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
Session 14 "Deep Mixing Method III"By Stefan Dahlin
The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation
Feb 10, 2003
-
Microstructure of Bio-Cemented Coarse SandBy Abdelmalek Bouazza, Aamir Mahawish, Will P. Gates
Bio-grouting by means of microbial induced calcite (calcium carbonate) precipitation (MICP) to improve mechanical properties of granular soils has gained much attention in recent years. The biogroutin
Jan 1, 1900
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017
-
Innovative Drilled Shaft Installation Process Through Existing Bridge FoundationsBy Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
Session 29 "Grouting for Tunnels 1"By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
Session 11 Jet Grouting IIBy George Burke
Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the w
Feb 10, 2003
-
Stone Columns At Trenton Water Treatment Facility - Suitable Alternative To Remove And Replace For Mat FoundationBy Darrell Wilder
The Trenton Water Treatment Facility in Trenton, New Jersey, is expanding to upgrade existing facilities and to meet the increasing demands of the public. The facility sits uncomfortably between the
Jan 1, 2008
-
Design And Analysis Of Cooling Tower Pile FoundationsBy Michael W. Oakland
This paper summarizes the analysis and design of a pile foundation system for two 400 ft. diameter, 500 ft. high cooling tower using a detailed finite element analysis package. The cooling towers are
Jan 1, 2010
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Keynote Lecture 6: Mitsuhiro Shibazaki Jet GroutingBy Mitsuhiro Shibazaki
Generally, water-soluble polymers are effective in convergence of water jet ejected from a nozzle as they add viscosity to water. However, excessive additional polymers (added to keep water viscous) c
Feb 10, 2003
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
No. 1 Queens Road - Melbourne, AustraliaBy Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005
-
Rammed Aggregate Pier System Provides Uplift Resistance At University Ice ArenaBy John G. DiGenova
The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are
Jan 1, 2011