Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Falconbridge's data highway

    By Lloyd F. Dunham

    "Crucial to the implementation of new computer-based information systems at Sudbury Operations of Falconbridge Limited was a data communications network that would take computing power to the various

    Jan 1, 1988

  • CIM
    CIM Uranium Leading Practice Guidelines 2024

    By CIM Mineral Resource

    On January 9, 2018, the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Council formed the CIM Mineral Resources and Mineral Reserves Committee (CIM MRMR Committee), which is a combinatio

    Nov 1, 2024

  • CIM
    Determination and Prediction of Solubilities for Sodium Silicates in Alkaline Carbonate Aqueous Solutions with Application for the Preparation of Precipitated Silica

    By George P. Demopoulos, Yan Zeng, Zhibao Li

    Precipitated silica is marketed with a rising demand as reinforcing filler in the rubber industry and as a potential raw material for the synthesis of lithium-ion battery electrodes. Due to an awarene

    Jan 1, 2015

  • CIM
    Cerro Verde Concentrator ? Four Years Operating HPGRs

    By S. Koski

    The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper an

    Jan 1, 2012

  • CIM
    The Flash Recycle System for the Cooling of Autoclaves Process Design and Operation

    By F. Crundwell, N. Steenekamp

    "The leaching of sulphide minerals generates a significant amount of energy. There are three systems that might be used to remove this energy. These are: cooling coils, quench water, and flash recycle

    Jan 1, 2012

  • CIM
    Performance and Cost Comparison of Materials Used in Design and Fabrication of Hydrometallurgical Equipment

    By T. Johnson, K. Lambrych, D. Kelley

    Materials for construction of equipment used in hydrometallurgical plants are selected based on a combination of their ability to perform as required in aggressive process environments as well as thei

    Jan 1, 2015

  • CIM
    Effect of Cold Working on Microstructure and Performance of CuCrZr Alloys

    By H. Huang, H. M. Chen, W. B. Xie

    Cu-0.8Cr-0.1Zr alloy were prepared by atmospheric melting. the microstructure and properties of the CuCrZr alloy after first cold rolled, solid solution, second cold rolled and aging treatment were an

    Jan 1, 2019

  • CIM
    Experimental Electric Smelting of Manganese Ores (ca29afc4-b842-40ff-8cd4-421e412a15a9)

    By R. A. Campbell

    Pig iron and silicospiegeleisen were produced experimentally from a very low-grade manganiferous iron ore from Steep Rock, Ontario, by a two-stage electric smelting process. The most favourruble opera

    Jan 1, 1958

  • CIM
    Production of Thorium Concentrate from Egyptian Monazite

    By A. M. Abdel-Rehim

    The present work reports a study of production of thorium concentrate from Egyptian monazite by decomposition of ammonium carbonate solutions containing ammonium thorium and uranyl carbonate complexes

    Jan 1, 2004

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • CIM
    Grate Pelletizing -An Operating Report and Process Comparison

    By H. A. Halupka, I. A. Mozer

    "At its plant in San Juan, Peru, Marcona Mining Company operates two grate pelletizing furnaces for the agglomeration of 3.5 million long tons of magnetic concentrates annually. Line One, installed in

    Jan 1, 1970

  • CIM
    Engineered Completions Increase Oil Recovery

    By R. W. Coburn

    The results of field experiments on wells which required stimulation indicated that engineered well-completions will cause an increase in ultimate recovery at reduced costs. Techniques and tools have

    Jan 1, 1960

  • CIM
    Biopolymers for Anti-Scaling Applications in Leaching Processes

    By C. Bergstrand

    "Precipitation of gypsum and the formation of scale may pose a serious challenge in the leaching of several minerals. As an example, precipitated gypsum may form scale in the machines increasing the n

    Jan 1, 2017

  • CIM
    Non-Destructive Assay of Gold and Other Metals in Bulk Mineral Samples

    By J. R. Tickner

    "Gold is conventionally analyzed using fire-assay or other destructive chemical methods that impose significant sample preparation, OH&S, and skilled labour requirements. Developed over the past 15 ye

    Jan 1, 2017

  • CIM
    Development of Innovative Recycling Technologies for Sustainable Metallurgical Industry

    By M. A. Halim, V. I. Lakshmanan

    Recycling is one of the key elements for sustainable process development for the recovery of value-added products and reducing environmental impact. Process Research ORTECH Inc. has developed several

    Jan 1, 2015

  • CIM
    Advanced Electrochemical Techniques to Monitor Corrosion Phenomena of Stainless Steels in Hydrometallurgical Environments

    By M. Lindgren

    "Hydrometallurgical processing involves process stages, like leaching, that create harsh environment for stainless steels. High acidity, the presence of chlorides and oxidizing ions combined with rela

    Jan 1, 2012

  • CIM
    Convert Hot Slag Directly Into Glass-Ceramics by Hot Slag Modification Process

    By Da-Qiang Cang, Qingde Wang, Wei Wang, Wen-Bin Dai, Min Guo, Yu Li

    Utilization of both slag and its heat for hot slag is a great challenge for iron and steel industry. Many methods of hot slag modification for directly converting hot slag into value-added materials w

    Jan 1, 2015

  • CIM
    Enterprise-Wide Optimization in Steelmaking: A Scoping Study

    By J. Worden, D. Hughes, S. Smart, H. Zughbi

    The enterprise wide optimization (EWO) of steelmaking and manufacturing is a multi-level, hierarchical problem which spans higher level corporate planning and scheduling through to the lower level ope

    Jan 1, 2015

  • CIM
    Torstein Utigard: The Man - The Scientist - COM 2015 - 54th Annual Conference of Metallurgists held in Conjunction with AMCAA - America's Conference on Al Alloys

    By C. Díaz, M. Barati

    Prof. Torstein Utigard's untimely death, in the spring of 2012, put an abrupt end to a meritorious career in the field of high temperature chemical process metallurgy. As an academic in the Depar

    Jan 1, 2015

  • CIM
    Development of Power Stabilization Systems for Electric Arc Furnaces

    By D. Shen, J. Cheung

    Variable reactance arc control by the SPLC (Smart Predictive Line Controller) has been installed at many different mining sites and steel processing plants around the world. Since its first installati

    Jan 1, 2015