Search Documents

  • SME
    Mining Review (8ea836c9-6346-4229-805b-5f63a4114d3f)

    Minerals contribute to the U.S. gross domestic prod-uct (GDP) at several levels?mining, processing and manufacturing finished products. In 2008, the estimated growth rate for the real GDP of the Unite

    Jan 1, 2009

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • SAIMM
    A Real Options Application To Manage Risk Related To Intrinsic Variables Of A Mine Plan: A Case Study On Chuquicamata Underground Mine Project

    By J. Botin

    Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance

    Jul 1, 2013

  • TMS
    Characterizing the Mechanical Properties of Wax-Coated Granular Composites

    By J. W. Bridge

    Triaxial compression tests at various confining pressures and temperatures, as well as tangent modulus tests using ultrasonic waves, were conducted for wax-coated granular composite materials. The mat

    Jan 1, 2010

  • SME
    Mine Production Scheduling Optimization At Newmont?s Twin Creeks Mine

    Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore

    Feb 27, 2013

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • AUSIMM
    The Geology and Mineralization of the MitchellÆs Creek or Bodangora Gold Mine, Central Western New South Wales

    The main orebody of the Bodangora mine is a metalliferous quartz reef within a major fault plane in the strongly folded and faulted volcanic rocks of the Ordovician-Silurian Oakdale Formation. The sim

    Jan 1, 1970

  • DFI
    Structural Underpinning By Pinpiles

    By D. A. Bruce

    Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per

    Jan 1, 1992

  • SAIMM
    Process Mechanisms In Ilmenite Smelting

    By J. H. Zietsman

    It has previously been observed that industrial high-titania slags display a compositional invariance, remaining close to stoichio-metric M3O5. The present study focuses on this invariance and the phe

    Jan 1, 2004

  • SME
    Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral Projects

    By S. Dessureault, Z. Gavelan

    As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat

    Jan 1, 2004

  • NIOSH
    Wireless MF Communication System

    By Larry G. Stolarczyk

    Jan 1, 1980

  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • CIM
    Owl Creek Processing Summary

    By O. Matwijenko

    "1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with

    Jan 1, 1988

  • ISEE
    Non-Electric Shock Tube Initiation Systems Applications and Hookups

    By John Watson, Tom Treleaven

    This guide presents nur-nerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide Quick reference by number of decks or bunc

    Jan 1, 1995

  • ISEE
    Future Directions in Ground Vibration and Airblast Control within an Australian Regulatory Context

    By A Brodbeck, AT Spathis

    Australian regulatory control of ground vibration and airblast arising from mining, quarrying and civil construction operations is spread across a number of federal, state and local authorities and ac

    Jan 1, 2005

  • SME
    Plant Performance Improvements Using Grinding Circuit ?Classification System Efficiency?

    ?Classification System Efficiency (CSE)? is a simple, powerful concept which can be used to measure and improve ball mill circuit efficiency. This paper describes six plant case studies which demonstr

    Jan 1, 2012

  • ISEE
    Application of Computer Blast Modeling to Oil Shale Mining

    By P J. Hommert, D S. Preece

    "Commercial development of the United States Oil Shale reserve will require substantial amounts of mining. In fact, even a modest 500,000 barrels per day industry requires a mining effort equivalent t

    Jan 1, 1989

  • SME
    Software - Benefits Of Building An Efficient Mine Planning Process

    By W. A. Wilkinson

    Mine planners are under pressure to evaluate the impact of changing economic times and newly acquired data on their mine plans. Incorporating changes such as commodity prices, customer sales, fluctuat

    Jan 1, 2010