Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Assessment Of Engineering Noise Controls At A Talc Processing PlantBy E. R. Spencer
National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi
Jan 1, 2008
-
Geochemical Profiling Of A Sulfide Leaching Operation: A Case StudyBy S. M. Flaherty, R. E. Scheffel, A. Guzman
Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me
Jan 1, 2006
-
Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line ConditionsBy J. D. Miller, C. L. Lin
Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l
Jan 1, 2001
-
Rib Support Optimization for a Room-and-Pillar MineThe National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C
Jul 28, 2020
-
Installation Of A State-Of-The-Art Ventilation Shaft At A New Mexico Coal MineBy A. Zeni, S. L. Bessinger, T. A. Palm
San Juan Coal Company (SJCC) operates an underground coal mine near Farmington, New Mexico. Continuous miners and a longwall produce 7-8 million tons per year. The coal seam at SJCC has tested to
Jan 1, 2006
-
RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case HistoriesBy K. Y. Haramy, K. Hanna
Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min
Jan 1, 1999
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay MudBy D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997
-
Coal Gasification And The Coal Mining IndustryBy Henry R. Linden
The demand for natural gas continues to increase at higher than anticipated rates, partly because of its widening price advantage over most other fossil fuels when the cost of air pollution control is
Jan 1, 1969
-
Analyzing the Implications of a Change in Mining Regulations on a Small City EconomyThere is wide agreement that sustainability has multiple dimensions, but substantially less agreement on the appropriate balance among those dimensions. This occurs because peoples’ vision of a sustai
Jan 1, 2005
-
Signal Processing With Wavelet Transform For In-Seam Seismic Based Mine Void Detection TechniqueBy M. Ge
Signal processing is a major challenge for In-Seam Seismic (ISS) technique. Fourier Transform is an important tool for signal processing such as frequency analysis. However, for ISS signal, localized
Jan 1, 2007
-
Dewatering Of Fine-Particle Slurries Using A Compound-Beach Decanter With Cake-Flow Control (SME Annual Meeting Feb. 26-28, Denver, Colorado)By A. H. Shapiro
A decanter centrifuge of novel design was developed for the dewatering of fine-solids slurries having micron-range particles that form paste-like, flowable, hard-to-dewater cakes. The design combines
Jan 1, 2001
-
National Mining Hall Of Fame To Honor Four (c2bf092c-db9b-40a9-aef1-4f24d0616a10)Ceremonies for the induction of four mining industry pioneers into the National Mining Hall of Fame will be held Saturday, Sept. 13, 2008 at the Charles F. Barber Pavilion of the Museum Convention Cen
Jan 1, 2008
-
Effect Of Particle Shape On The Filtration Rate In An Industrial Iron Ore Processing PlantBy J. J. Carlson
Studies were carried out to determine whether filtration rate changes observed in an iron ore concentrator were due to variations in particle shape. It was confirmed that ores mined from different loc
Jan 1, 2008
-
St. Louis Skinker–McCausland TunnelBy Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Study on the performance of ventiflex ducting and couplingsBy L. M. Anisdahl
Ventiflex is a flexible ventilation duct system with a global market within mine and tunnel ventilation. The system is distributed in a wide range of qualities and dimensions. It is very important tha
Jan 1, 2009
-
Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case StudyBy Y. Q. Zhang, S. S. Peng
Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st
Jan 1, 2004
-
Beacon Hill Station Dewatering Wells and Jet Grouting ProgramBy Zephaniah Varley, Dominic Parmantier, Paul Schmall, Richard Martin, Red Robinson
Sequential excavation of the Beacon Hill Station has been accomplished in highly complex and inter-layered sand, silt, and clay soils with multiple perched groundwater tables. Successful excavation ha
Jan 1, 2007
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In BostonBy J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long
-
New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic PressuresBy George Watson, Gu Quanzhong, S. Gerard Sawyer
Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be
Jan 1, 2005
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build ContractBy David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005