Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Western Europe's Largest Underground Blast
By P McConnell, T Garrigan
Tara Mines Limited, in Ireland, is Western Europe's largest zinc mine. Annual metal production, from 2.5 million tonnes of ore, consists of 180,000 tonnes of zinc and 34,000 tonnes of lead.
Jan 1, 1989
-
Ring Blasting Design Modeling and Optimization
By María Rocha, Benjamín Cebrián, Roberto Laredo
"Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all
Jan 1, 2017
-
Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation
By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma
Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b
Feb 6, 2023
-
Investigation of Cautious Blasting Model Applied During Tunneling of Kadikoy-Kartal Subway Construction
By Ali Kahriman, Olivio Angelini, Ibrahim Sefer, Burak Ekmen, Koray Arpak, Ertugrul Kaya, Yucel Karakus, Abdullah Sak, Aziz Ozdemir
In recent years, in order to bring solution to traffic intensity arising from transportation problems and facilitate public transportation in the modern world in paralel to urbanization and to the inc
Jan 1, 2010
-
Hole Diameter: Does it Affect Vibration Attenuation?
By Tyler Acorn, Paul Worsey, Nathan Rouse
The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr
Jan 1, 2013
-
Underground Mega Mass Blasting with Electronic Initiation Near Urban Area (d4770d5b-0062-4b3c-9658-460485a3a3f4)
By Jean-Francois Lagueux, Andre Pomerleau
Goldex Mine is an underground mine located near the town of Val-d’Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco
Jan 1, 2011
-
Damage to Rock: Near Field Seismic Models Revisited
By Santiago Gómez, Pablo Segarra, José A. Sanchidrián
In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is
Feb 1, 2020
-
Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)
Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm
Jan 1, 2008
-
Development, Application and Review of Ontario's Quarry Blasting Vibration Guidelines
By Lance McAnnuff
Whatever system is devised to control noise and ground vibration from blasting operations must present an effective compromise between the rights of the individual to be undisturbed by the actions of
Jan 1, 2004
-
ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine
By Yong Pan, Purushotham Tukkaraja
It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose
Jan 1, 2019
-
Surplus Military Propellants as Ingredients in Commercial Explosives
By Kevin Tallent
The use of military-type energetic materials in commercial explosive products is not a new concept. In the United States, the techniques for utilizing significant quantities of surplus military explos
Jan 1, 2000
-
Presplitting at the Pioneer Wolffdene Quarry
By Evan Boone, Peter Bellairs
A technical services visit was conducted to determine the initial parameters to successfully presplit several benches for an input crusher installation at the Wolffdene quarry. The paper details the p
Jan 1, 1998
-
Challenges Related to Near-Field Blasting between Critical Interstate and Railroad Infrastructure
By Luiz Felipe Mendonça de Amorim, Adimir Fernando Rezende, Gustavo Sampaio Lopes, Claudio Cesar Gajardo Arraño, Eltton de Sousa Veras, Manuel Villalobos Calderon
Many technical challenges were encountered while conducting near-field construction blasting between the critical intersection of Interstate 10 and multiple active railroad tracks in El Paso, Texas, f
Jan 1, 2019
-
Important Considerations When Selecting Rotary Blasthole Drills for High Altitude Use
By Lyall Workman
New mines are frequently located at altitudes above 3,000 meters (10,000 ft.). Drill selection must take the altitude effects into account, to insure high productivity and good bit life. In particular
Jan 1, 2007
-
Coupled Rock Motion and Gas Flow Modeling in Blasting
By Steven D. Knudsen, Dale S. Preece
The spherical element computer code DMC (Distinct Motion Code) used to model rock motion resulting from blasting has been enhanced to allow routine computer simulations of bench blasting. The enhancem
Jan 1, 1992
-
Testing of a New Blasting Mat Constructed Using Rubber Tractor Treads
By Matthew K. Coy, Paul N. Worsey
The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea
Jan 1, 2015
-
Implementation of Track & Trace Solutions in Existing Production Environments
By Frank Hirthammer
The paper explains the procedure of implementing Track & Trace solutions for manufacturers of explosives based on customer experiences. By using concrete examples, the process from project start to im
Feb 1, 2020
-
A Review of Rock Classification Methods and Applicability to Blast Design
By Hae-Moon Choi, Sang-Don Lee, Hee Soon Shin, Choon Sunwo, Chang-Ha Ryu, Hyun-Koo Lee
Building tunnels means dealing with what rock is encountered. Relocation of the site of the underground structure is rarely possible. Tunneling engineers and miners have to cope with the quality of th
Jan 1, 2004
-
Electromagnetic Characterization of an Explosives Mixing Site at Blackie, Alberta
By David G. Paton
"Electromagnetic surveys were conducted at the BXL Bulk Explosives Limited Mixing Plant andsurrounding area to characterize runoff from the site and possible impacts of salinity. The BXL Plant is loca
Jan 1, 1999
-
A Comprehensive Blast Damage Control Plan for The Missing Link
By Alvin D. Christmas
The missing link is a connector between the congested downtown area of Knoxville, Tennessee adjacent to the former World's Fair site, the I_40 I_75, and Western Avenue traffic arteries. This connecter
Jan 1, 1995