Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods
By Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Ductile Iron Pile Foundation Solution for Interior Retrofit Projects
By Keithe J. Merl, Brendan FitzPatrick, Gregg Piazza
Urban and industrial construction projects commonly involve interior work within buildings, warehouses and manufacturing facilities. Renovations of these existing structures must address both structur
Jan 1, 2019
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East
By Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Performance Monitoring for Deep Excavations
By Alexi J. Neill
"This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris
Jan 1, 2016
-
High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USA
By Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka
"The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine
Jan 1, 2017
-
Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing Bridge
By Diane Reid, Antonio Marinucci, Robin Mao
Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve
Jan 1, 2019
-
Effects of Deep Mixing Method to Reinforce Earth Levees in the Mekong Delta, Vietnam
By Bao K. Le, Khang T. Truong, Masaki Kitazume, Toru Kobayshi, Long P. Le, Tanaka Hitoshi, Makoto Kamimura, Hoang-Hung Tran-Nguyen
"Earth levees constructed using dredged materials taken from a river along an earth levee have annually damaged in the Mekong Delta due to high void spacing in earth levees and floodwater. Sliding and
Jan 1, 2015
-
Summary of Main Standards and Guidelines on Grouting Available in North America and Europe
By R. B. King
This document was prepared by the DFI International Grouting Committee with the intent to provide a summary of main Standards and Guidelines available for the North America and Europe grouting industr
Jan 1, 2021
-
Effects Of Change In The Support System On Temporary Secant Pile Wall
By Anburaj C., Srinivas A.
Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman
Nov 1, 2022
-
Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges
By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C
Jan 1, 2014
-
-
Geotechnical Assessment Of Highly Saline Soil Stabilized With Fly Ash - Cement Admixtures
By Jahnavi Parmar, Pranav R. T Peddinti, Saloni Pandya, P. S. Prasad
Coastal cities are in desperate need of suitable land to meet the ever-increasing demand for urban infrastructure to support commercial, residential, tourism, and off-shore activities. Countries with
Sep 1, 2022
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway Embankment
By Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation
By James R. Gingery, Byron Foster, Bret Lingwall
While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th
Sep 8, 2021
-
Foundation Soil Strength Characterization Of Coastal Plain Deposits Along I-64 Corridor In Virginia
By Sushant Upadhyaya, Deniz Karadeniz
As part of the widening of I-64 in Williamsburg, Virginia, an extensive subsurface exploration program consisting of Standard Penetration Tests (SPT), Cone Penetration Tests (CPT), Dilatometer Tests (
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai (c152f4a9-990c-402e-baf3-fbbcafc7e905)
By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
Application of Innovative Underreamed Ground Anchorage with Capsule
By Gang Guo, Zhong Liu
"In response to an increasing demand of anchored structures for underground space and transportation infrastructure in China, an innovative underreamed ground anchorage system was created. The novel a
Jan 1, 1900
-
Quality Control And Estimation Of Axial Resistance By Using An Expander Body, A Large-scale Pressuremeter
By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci
This paper describes the general principles of the expander body with post-grouting (EBI) system, and how it is similar in nature to a large-scale pressuremeter device. The results from the installati
-
Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project
By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews
"The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re
Jan 1, 2016
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge
By Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021