Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Recent Process Additions to the Royal Canadian Mint 2005-2011

    By V. Aprahamian, T. Cheng, M. Tangen, R. Beauprie

    The Royal Canadian Mint has implemented significant process additions since 2005. Installation of a whole new highly automated silver refining circuit has allowed recovery of physical silver from gold

    Jan 1, 2011

  • CIM
    Monitoring Canada's Mine Production

    By H. L. Martin

    A joint federal-provincial approach in gathering basic information from industry on mine production, concentrator operations and ore reserves, initiated during 1978, is a major step toward the goal of

    Jan 1, 1979

  • CIM
    The Development of the Coal Industry 1n Canada, from 1920 to 1935

    By F. W. Gray

    IN 1922, the writer communicated to the Institute a paper entitled The Development of the Coal Industry in Canada (1), which summarized the considerations set out in a series of papers (2) concerned w

    Jan 1, 1936

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • CIM
    Vibration effects on mine workers

    By Stanley G. Hutton, Robert Brubaker

    "It has long been recognized that mining workers subjected to high levels of hand-transmitted vibration may suffer from vibration-related complaints. Prolonged exposure to whole-body vibration may als

    Jan 1, 1982

  • CIM
    Multiple Feeder Control

    By André Vien, Pedro Gonzalez, Julio Palomino, Rob Perry

    "In many mineral processing plants ore is reclaimed from a stockpile using multiple feeders. The discharge from these feeders is combined onto a single conveyor from which total tonnage is measured. T

    Jan 1, 2000

  • CIM
    Processing Plant Expansion at Kittila Mine Affords Opportunity for Significant Material Handling Improvement

    By T. Holmes, J. Middlemiss

    "Agnico-Eagle (AE) has been operating their Kittila Mine in Northern Finland since 2008. The mine has experienced considerable ore flow problems with ratholing, bridging and freezing in their mill fee

    Jan 1, 2017

  • CIM
    Geology and setting of the Red Mountain gold-silver deposits, northwestern British Columbia

    By D. A. Rhys, M. Sieb, M. A. Prefontaine, C. L. Swanson, S. R. Frostad, H. Q. Smit

    "Gold-silver mineralization at Red Mountain (1992 resource of 2.5 million tonnes grading 12.8 g/t Au and 38.1 g/t Ag) occurs within several discrete zones within a folded sequence of Middle to Late Tr

    Jan 1, 1995

  • CIM
    Emplacement Features of Cupriferous Noritoids in the Okiep Copper District, Namaqualand, South Africa

    By Michael K. Watkeys, Charlesworth. E. GUY, Jacobus E. Potgieter, Anhaeusser. Carl R., Roger L. Gibson, Alexander F. M. Kisters

    Abstract - Intrusive features of cupriferous noritoids from the deeply eroded Proterozoic granite-gneiss terrane of the Okiep Copper District in South Africa illustrate the emplacement of basic magmas

    Jan 1, 1994

  • CIM
    Evaluating the Effect of Seeding on Zinc Recovery through the Zincor Iron Removal Circuit

    By Jochen Petersen, Diane Taggart

    "At an average of 90.3% (for the period of 1 January 2009 to 30 September 2011), Zincor’s zinc recovery was well below the industry standard of 96%. The losses through the residues, in particular the

    Jan 1, 2016

  • CIM
    The Geology and Mineral Deposits of the Harricanaw And Bell River Basins

    By George W. Bain

    Summary During the last three years the discovery of gold in the belt of volcanic and sedimentary rocks extending eastward from the Porcupine and Kirkland Lake gold-fields has caused a great deal o

    Jan 1, 1927

  • CIM
    Sélection optimale des quantités d'explosifs basée sur des contraintes de production et un résultat d'analyse de régression multiple

    By J. L. Collins

    "Une recherche debutee en 1987 tente de cerner divers éléments ayant un impact sur la productivite miniére, de facon à améliorer la planification des operations souterraines. II a été possible de recu

    Jan 1, 1990

  • CIM
    The end of horizontal zinc retorting in the United States

    By J. E. Dutrizac

    "The end of an era in zinc metallurgy took place on July 31, 1976 when the horizontal retort furnaces of the National Zinc Company in Bartlesville, Oklahoma were permanently shut down (1) . For more t

    Jan 1, 1999

  • CIM
    K-Ar and Rb-Sr dating and the genesis of tungsten at the Clea tungsten skarn property, Selwyn Mountains, Yukon Territory

    By K. M. Tompson, R. L. Armstrong, C. I. Godwin

    "Tungsten skarn deposits on the Clea property in the Selwyn Mountains, Y. T., are related genetically to a quartz monzonite stock, about 500 metres in diameter at the surface. Lower Paleozoic sediment

    Jan 1, 1980

  • CIM
    The First Electrolytic Copper Refinery in the USA at the Chemical Copper Co. Phoenixville, Pa – History Revisited

    By E. Wraith, W. W. Culver, B. Wesstrom, P. J. Mackey

    Electrodeposited copper of the 1860s was of unprecedented purity, although the profound significance of this achievement was not fully realised until the dawn of the electrical age a decade or so late

    Jan 1, 2019

  • CIM
    Developments and Trends in Mining in the Slovak Republic

    By P. Cicmanec

    Mining activities in the territory of Slovakia have a long history. Mining techniques have developed rapidly in the last centuries. This paper deals not only with mining history, but also with undergr

    Aug 1, 2013

  • CIM
    Gold Alloy Deformation Processed Metal - Metal Matrix Composite Wire

    By Timothy W. Ellis

    Wire Bonding is the dominant IC interconnection process presently used in the semiconductor assembly industry (1). The flexibility, adaptability and cost of wire bonding will continue to keep it as th

    Oct 1, 2003

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Summary Of The EU Voluntary Copper Risk Assessment

    By K. Delbeke

    Within the framework of the EU Existing Substance (93/793/EEC) and REACH regulations EC/1907/2006), the copper industry initiated in 2000 a comprehensive Voluntary Risk Assessment of copper and severa

    Jan 1, 2007

  • CIM
    Preliminary Environmental Modelling of Effluent Nitrogen Species Concentrations for Feasibility Level Open Pit Mine Projects

    By Catherine T. Ziten

    Introduction ?Environmental assessments required for permitting ?Focus on ammonia produced through mine construction & blasting ?Water quality guidelines: federal, provincial, IGO ?Reported values

    May 1, 2009