Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Incorporating Liberation Information in Flotation Models

    Flotation of a mineral bearing particle is the result of successful completion of a chain of events, such as, producing particles with sufficient exposure of the valuable mineral on the surface, reage

    Jan 1, 2016

  • CIM
    Extraction of Rare Earth Elements from Various Ion-Adsorption Clay Materials

    By F. Cheuk, E. Krause, V. G. Papangelakis, G. A. Moldoveanu, S. Abendschein

    Systematic studies have been conducted at the University of Toronto in order to evaluate lanthanide extraction from clay minerals from different geographical regions. It was found that rare earth elem

    Jan 1, 2014

  • CIM
    Backfill practices at the Williams mine

    By D. Bronkhorst, J. Rheault

    "Backfill practices at the Williams mine have evolved significantly since underground mining began in 1986. The use of conveyors as a means of transporting fill material to stopes has been discontinue

    Jan 1, 1994

  • CIM
    Low Temperature Oxidation of CO and Hydrocarbons over Supported Gold Catalysts

    By Renaud Cousin

    Supported gold catalysts were prepared by Direct Anionic Exchange on an alumina support and tested during the reaction of CO oxidation and of saturated and unsaturated hydrocarbons (C1 to C3). The cat

    Oct 1, 2003

  • CIM
    A Mixed Integer Linear Programming - Based Short-Term Planning Tool

    By Zhanyou Huang

    The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr

    Oct 1, 2009

  • CIM
    A Mixed Integer Linear Programming - Based Short-Term Planning Tool

    By Zhanyou Huang

    The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr

    Oct 1, 2009

  • CIM
    Speciation of Uranium in Amorphous Silica Layers

    By Jennifer L. Durocher

    The speciation of Uranium in silica-rich depositional layers in the proximity to uranium ore deposits was investigated using micro X-ray fluorescence (VESPERS beamline), X-ray Photoelectron Spectrosco

    Aug 1, 2010

  • CIM
    Numerical Model Parametric Study on the Effect of Stope Undercutting

    By H. Zniber El Mouhabbis

    Ore dilution or stope overbreak increases the cost of production and ultimately reduces the profitability of a mining operation. The adverse economic impact of ore dilution is due to the added costs a

    May 1, 2009

  • CIM
    Revisiting Ground Vibrations due to Mining Equipment Motion (7108fd07-daac-4ac4-863b-5e76cda3b2f0)

    By T. G. Joseph, M. Welz

    ABSTRACT: Joseph (2002) introduced passive seismic monitoring to measure mining equipment performance. This paper evaluates the potential of passive seismic monitoring to correlate mining equipment op

    Jan 1, 2011

  • CIM
    The Use of Tomographic Imaging in Mineral Exploration (8a096aac-fcda-4555-92b7-d7a8441f4db9)

    By A. Fawceit, B. C. Dyer

    "The basis of the tomographic velocity imaging technique is briefly described and an application of the method to detect and image a cross-section through a chromite pod is presented. Using the chromi

    Jan 1, 1994

  • CIM
    Unlocking Thickener Performance

    By R. A. Triglavcanin

    Delivering dilution water and mixing this water with incoming feed slurry, addition of flocculant, maximising flocculant-slurry interaction to build aggregate size, unabsorbed flocculant percentage, v

    May 1, 2009

  • CIM
    Non-Destructive Testing ?Gear Inspection Crack Detection on Bull Gears Using Advanced Eddy Current Techniques

    By Tom Shumka

    INTRODUCTION ?This bull gear inspection technique was developed to provide more accurate data and faster inspection times than current techniques used today. ?Eddy Current Array (ECA) is a non-dest

    Oct 1, 2010

  • CIM
    "Large Volume Flotation Machines”

    By H. J. Chalmers

    "Since the advent of large volume flotation machines, Cominco Ltd. has actively studied possible application of such machines to their various milling operations. A number of installations have been m

    Jan 1, 1974

  • CIM
    Design of the jointed roof in stratified rock based on the voussoir beam mechanism

    By P. Mottahed, J. Ran

    Mining practice and research have shown that the jointed roof in stratified rock behaves like a voussoir beam structure with strength greater than that determined by the continuous beam theory. Previo

    Jan 1, 1995

  • CIM
    Developing Copper Arsenic Resources with CESL Technology

    By V. Omaynikova, A. Lossin, H. Salomon-de-Friedberg

    In 2009, Aurubis AG and Teck Resources Limited, recognizing a growing industry need, joined together to advance and further develop technology to deal with arsenic-bearing copper concentrates in an ef

    Jan 1, 2014

  • CIM
    Characterization of Rare Earth Element Ores with High Spatial Resolution and High Counts Rate with a Field-Emission Scanning Electron Microscope

    By K. E. Waters, N. Brodusch, R. Gauvin, C. Teng, H. Demers

    Rare earth elements play an increasingly important role in renewable energy devices and high-end electronics. In this project, the composition and morphology of REEs-bearing minerals are characterized

    Jan 1, 2014

  • CIM
    Fiabilité Totale d ?Usine (FTU) Concentrateur Agnico-Laronde

    Fiabilité Totale d?Usine (FTU) Plan de la présentation ?Théorie de l?entretien ?Analyse comparative juin 2005 ?Session de travail 2005-2006 ?Suiviet Résultats(IndicateursdePerformance)

    Feb 1, 2008

  • CIM
    Frictional Properties of the Stressed Limestone Fracture

    By Z. Zhong, Y. J. Hu, D. Elsworth

    "A standard triaxial apparatus was set up to perform sliding tests. Slide-hold-slide (SHS) tests, with hold times from 10 to 3000s and at invariant effective confining pressures of 1MPa, incremented t

    Jan 1, 2015

  • CIM
    CSR at Canadian Mining Operations Overseas: Learning from the Multi perspective Collaborative CSR Case Studies Pilot Project

    By Kernaghan Webb

    Organization of Presentation ?Genesis, Premise, Hypothesis ?Background ?Methodology ?Key research questions ?Research Team to Study Kinross Maricunga ?Research Milestones ?Chilean context ?Chi

    May 1, 2010

  • CIM
    The Implementation of a Mobile Equipment Data Collection System at Vale Inco

    By Peter D. Cunningham

    At Vale Inco in Sudbury, underground mobile equipment production and maintenance data is presently collected manually from paper slips. This paper reviews a pilot project that developed a system to el

    Oct 1, 2009