    From Theory to Practice: Designing For Situation Awareness to Transform Shovel Operator Interfaces, Reduce Costs, And Increase Safety

    By E. Onal, C. Craddock, A. Chapman, M. R. Endsley

    ABSTRACT Mining equipment operators must interpret and respond to complex information delivered by technology-centric rather than user-centric systems. The ability to achieve high situation awareness

    Jan 1, 2013

  • CIM
    International Transportation and Marketing of Canadian Potash

    By Kevin B. Doyle

    "Canada now supplies 23 per cent of the world demand for potash. Although potash is produced by many countries, Russia and Canada have the greatest reserves and capability to supply the future substan

    Jan 1, 1976

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    Integration of BIM and Automation in High-Rise Building Construction

    By R. Heikkilä

    In this paper the utilisation of building information models (BIM) and construction automation on building sites is discussed. A lot of research has been carried out to develop new applications for us

    Aug 1, 2013

  • CIM
    Integrating Geometallurgical Parameters into Mining Grade Control at Operating Mines

    By William Shaw

    Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de

    Oct 1, 2009

  • CIM
    Japan -Export Market for Western Canadian Bituminous Coal

    This paper outlines the position and capabilities of Western Canada's bituminous coal industry, and indicates the increasing importance of Japan as an export market. The use of coal in Japan is r

    Jan 1, 1964

  • CIM
    Mine Planning for Ore Dilution

    By John G. Henning

    Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents results of a study on the influence of a

    May 1, 2007

  • CIM
    Adsorption of Guar Gum on Potash Slimes

    Adsorption of guar gum was investigated on model minerals typically found in water-insoluble slimes of potash ores. The ionic strength of the adsorption mixtures was varied from distilled water to sat

    Jan 1, 2006

  • CIM
    A Microstructural Study of the Fatigue and Dwell-Fatigue Behaviour of ATI 718plus® Alloy

    By S. Oppenheimer, P. Au, R. M. Kearsey, J. Tsang, E. McDevitt

    A new superalloy, ATI 718Plus® Alloy (718Plus), has been developed to have a 55oC higher temperature capability over the traditionally used Alloy 718, while maintaining favourable processing character

    Jan 1, 2010

  • CIM
    Laurentian Problems and Atomic Disintegration

    By Alfred C. Lane

    Reference to the original use of the terms Laurentian and Huronian (and its extension), shows that the former was applied to granitized sedimentary and metamorphic pre-Cambrian rocks, and the gneissoi

    Jan 1, 1925

  • CIM
    Some Principles and Practices of Profitable Gold Mine Operation

    By I. M. Marshall

    A review of technical literature covering Canadian mining emphasizes the advancement and changes that have been made in mining practice. However, current technical publications rarely outline basic pr

    Jan 1, 1939

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • CIM
    Smelter contracts

    By D. Farrish, W. A. Grell

    "IntroductionMost base metal mines sell their concentrate to a custom smelter. The two parties concerned therefore draw up a contract which would detail the conditions under which concentrate sales wi

    Jan 1, 1989

  • CIM
    A Discussion of Deep Drilling In the Blind River Area

    By D. S. Robertson

    More than 700,000 feet of diamond drilling was completed in the Blind River area between 1953 and 1958. Much of this drilling was at depths which are still not usual in North America. However, as the

    Jan 1, 1962

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • CIM
    Treatment of Non-Magnetics at Falconbridge

    By C. H. Dionne, J. A. Holmes, B. J. Huls

    "Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce

    Jan 1, 1991

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003