Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection tests

    By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte

    Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes

    Jan 12, 1986

  • SME
    Crisis Management: What To Do If Disaster Strikes

    By Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich

    The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later

    Jan 1, 2004

  • SME
    Cut And Fill Narrow Vein Mining At Hollister

    Narrow vein mining, with enough challenge and also where the cutting edge technology can be applied, is still a very important and exciting portion of the mining industry. Based on the deposit charact

    Jan 1, 2012

  • SME
    Implementation Of The HydroFloat Technology At The South Fort Meade Mine (b0ff9df4-18a3-4533-954f-95c4d4f285a2)

    Several industrial-scale HydroFloat separators have recently been installed at Mosaic?s South Fort Meade beneficiation plant for the purpose of improving phosphate recovery and throughput capacity. Th

    Jan 1, 2007

  • SME
    Pre-conditioning/Pre-excavation Grouting of the Soils Prior to Tunneling Below Highways and Railways: Case Histories from the Past Decade

    By Alex Naudts

    Pre-excavation grouting is a predictable and reliable technique performed to prevent or minimize settlement in advance of, or during the tunneling operation. It safeguards the infrastructure above the

    Jan 1, 2008

  • SME
    Exploring Jurassic Porphyry Coppers In The Amazon Jungle Of Ecuador

    By J. D. Lowell, L. Quevedo

    I will talk today about a porphyry copper exploration program now underway in the Amazon jungle in the southeastern part of Ecuador near the border with Peru. The project is unusual for two reasons:

    Jan 1, 2002

  • SME
    Liner System Protects Oils Sands’ Tailings Area

    Syncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and

    Jan 1, 2000

  • SME
    Control Of Iron In Copper Electrolyte Streams With A New Monophosphonic/Sulphonic Acid Resin (SME Annual Meeting Feb. 28-Mar. 1, Salt Lake City, Utah)

    By M. J. Gula, S. S. Xue, E. P. Horwitz, J. T. Harvey

    A study has been conducted to control iron in copper electrolyte streams using Eichrom Industries’s new Monophosphonic /sulphonic acid resin. The resin strongly and selectively extracts ferric ion ov

    Jan 1, 2000

  • SME
    Unitized, Portable Flotation-Leach Plants For Treating Partially Oxidized Gold And Silver Ores

    By Paul H. Johnson

    Resource Engineering and Development, Inc. is desigining and building a portable 150 to 225 tpd, flotation-cyanide leach plant with unitized, skid-mounted components. This plant design, with its porta

    Jan 1, 1981

  • SME
    Improving Secondary Grinding Capacity At The Empire Concentrator

    By H. Walqui, G. Rajala, G. Suardini

    The Empire mine began operations on 1963. Low grade Magnetite ore is processed to produce iron pellets for blast furnace feed. Three expansions were added to the original plant and several equipment u

    Jan 1, 2007

  • SME
    Evaluation Of Novel GP Clay Binders In Iron Ore Flotation - Preprint 09-084

    By D. Tao

    The reverse cationic flotation is the most widely utilized flotation method for concentrating iron ore. In such a process quartz is often floated with ether amines (R?O(CH2)3?NH2) partially neutraliz

    Jan 1, 2009

  • SME
    Roadheader Performance On The Caldecott 4th Bore Tunnel

    By D. Kwietnewski

    The 4th bore of the Caldecott Tunnel is a 50-ft horseshoe shaped highway tunnel located in the hills east of Oakland, California. Tunnel excavation was mostly completed using one of the world?s large

    Feb 27, 2013

  • SME
    NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel

    By Steve Klein

    The Transbay Downtown Extension (DTX) in San Francisco involves the construction of a large-span tunnel with a width ranging from 43 to over 60 feet. The tunnel will be excavated using the New Austria

    Jan 1, 2008

  • SME
    Synthetic rutile from a low-grade titania slag using sulphation-roasting process

    By I. M. Morsi, S. Z. El-Tawil, O. A. Fouad, K. A. El-Barawy, M. B. Morsi, M. M. Nasr

    Upgrading of a low-grade titanium slag (~55% TiO2) with high silica, calcia, magnesia and iron contents has been studied using sulphation roasting technique using SO2/air gas mixture followed by hydro

    Jan 1, 2005

  • SME
    Using a QSO Expert Model to Generate Quarry Optimization Plan to Improve Operation at Lafargeholcim Limestone Quarry, Crystal River, FL

    By K. Boakye, T. Newman, P. Bláha, M. B. Toelle

    "This paper presents a quarry optimization plan using a block model and an in-house development quarry scheduling and optimization software (QSO Expert) to help improve quarry operations at Crystal Ri

    Jan 1, 2017

  • SME
    A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi Crossing

    By Chester M. F. Peters

    The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first

    Jan 1, 1997

  • SME
    Performance Evaluation Of Friction Stabilizer Bolts

    By Franz Walchshofer, Mark Kuchta, Nobuharu Isago, Ugur Ozbay, Wolfgang Dolsak

    A series of in situ pull test were performed on a new design friction stabilizer bolt with the objective of determining its performance characteristics. The bolt is installed while drilling, thus imp

    Jan 1, 2005

  • SME
    Evolution And Success Of Gold Roasting Utilizing Lurgi's Circulating Fluidized Bed Technology (CFB)

    By E. Stolarski

    The circulating fluid bed (CFB) technology can proudly point to its history of more than a quarter of a century of commercial operations. Over 80 CFB units operate in aluminum calcining, coal combus

    Jan 1, 1998

  • SME
    A Proposed Model Of A New Laboratory Magnetic Separator For Mineral Processing. - Preprint 09-120

    By M. S. Riyazulla

    A model of a new laboratory magnetic separator has been conceived to cater the needs of process engineers and mineralogists world over engaged in mineral characterization and beneficiation. It would b

    Jan 1, 2009

  • SME
    Instrumentation Of Open Cut Subway Excavation For The Metropolitan Atlanta Rapid Transit Authority (MARTA)

    By Rodney K. Morrison

    MARTA, The Metropolitan Atlanta Rapid Transit Authority, is building a 53 mile heavy rail transit system to serve the City of Atlanta. Phase A of the Rail System, consisting of approximately 14 miles

    Jan 1, 1979