Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Applications of Microseismic Monitoring in China?s Underground Coal Mines

    By Xiangxi Wu

    Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of

    Jan 1, 2012

  • SME-ICGCM
    Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia

    By Takashi Sasaoka

    The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th

    Jan 1, 2008

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    Test Method for Assessing Water Degradation Potential of Coal Measure Rocks for Analyses of Floor, Roof, and Ribs

    By G. J. Hasenfus

    There are no known published methods of estimating the degradation of coal measure rocks by water that are simple and efficient, yet still provide a quantitative, meaningful value for assessing the st

    Jan 1, 2005

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Weightings And Water Inflows During Longwall Working

    By I. W. Farmer

    Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are

    Jan 1, 1996

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994

  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • SME-ICGCM
    Rib Support Innovation At Daw Mill Colliery (a22a0861-1502-4d3d-a2cd-8a6ba0c13271)

    By Jon Bowler

    Daw Mill Colliery, UK Coal, near Coventry in England, mines the Warwickshire Thick Seam at 800 m/2500 ft depth using longwall retreat with gateroads supported by rockbolts. Over the last eight years

    Jan 1, 2009

  • SME-ICGCM
    In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United Kingdom

    By Paul N. Freeman

    This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe

    Jan 1, 1992

  • SME-ICGCM
    Development of Low Profile Remote Roof Bolting Module

    By Bill Kyslinger

    In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta

    Jan 1, 2006

  • SME-ICGCM
    Microseismic Monitoring In The Sydney Coalfield

    By G. R. Corbett

    Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst

    Jan 1, 1994

  • SME-ICGCM
    Roof Control Analysis In North River Mine

    By Mike Watts

    Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month

    Jan 1, 2000

  • SME-ICGCM
    New Monitoring Technologies for Measuring the in-situ Performance of Rock Bolts

    By Hani Mitri

    Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a

    Jan 1, 2012

  • SME-ICGCM
    Development of Mains in Challenging Ground Conditions

    By Kot F. v. Unrug

    The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In

    Jan 1, 2006

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and Bleeders

    By Peter Zhang

    Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics

    Jan 1, 2012