Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Open-Pit Planning at the Adams Mine

    By F. J. West

    This paper deals with Jones & Laughlin Steel Corporation's new Adams mine, near Kirkland Lake, Ontario. After a brief discussion of ore structure, type, reserve tonnages, etc., the main body of the pa

    Jan 1, 1966

  • CIM
    Development of an Automated Freeform Construction System and its Construction Materials

    By Kwang-Hyun Jeon

    Recently, 3D printing technology in the manufacturing field is in the spotlight. In the construction industry, similar rapid prototyping technology that does not use conventional form can be applied t

    Aug 1, 2013

  • CIM
    Air Granulation of Copper Slags for Iron Silicate Production Part 2: Drawing Parallels from Air Granulation of PGM Converter Slag

    By M. Mahdi, L. So, A. MacMillan, D. Metcalfe, J. Woloshyn, D. Sauter, N. Uys, JP. Janse van Rensburg

    For city smelters, with limited real estate, efficient slag cleaning furnaces followed by water granulation to produce an iron silicate product is the preferred process approach. Water granulation, ho

    Jan 1, 2019

  • CIM
    Evaluation of Spiral Performance for Processing Iron Ore from the Carol Lake Deposit of the Iron Ore Company of Canada

    By G. Chung, W. Petruk, D. Doyle

    "A series of tests was conducted on Carol Lake iron ore, which contains about 38 wt % hematite and 19 wt % magnetite, to establish a flowsheet for high weight yield by spirals. A pilot plant was run i

    Jan 1, 1993

  • CIM
    Voluntary Emissions Reductions: Tools

    By Lauri Gregg

    How Can Man Meet the Carbon-Free Energy Challenge ? ? Increases in Energy Efficiency can displace 1/2 to 2/3 of the Carbon-Free Energy required to stabilize at 550 ppmv ? Renewable Energies requir

    Nov 1, 2002

  • CIM
    Novel Treatment of Complex Impurity-Rich Copper Matte by Using Iron Carburization at 1473k

    By L. Voisin, G. Damm

    "In order to develop a new pyrometallurgical process for eliminating detrimental arsenic and antimony from the impurity-rich matte produced from copper concentrate, and for treating the occasionally g

    Jan 1, 2014

  • CIM
    Improved Pellet Reducibility by Closing Grinding Circuits with Hydro Classifiers at QCM?s Pellet Plant

    By Guy Chevalier

    QCM?s pellet plant, located in Port-Cartier, Quebec, produces up to 8.6 million tons of iron ore pellets annually. Four different types are produced: three for blast furnace operations and one for dir

    May 1, 2003

  • CIM
    Numerical Simulation of Rock Cone Pullout and the Influence of Discrete Fracture Network Statistics on Foundation Anchor Capacity

    By B. Panton, J. Carvalho, E. T. Brown

    "A major consideration in the design of high capacity tiedown anchors for dam, bridge and tower foundations is the tensile resistance of the rock mass to pullout, typically as a result of overturning

    Jan 1, 2015

  • CIM
    Geochemical Characterization of Podiform Chromite Ores from the Ultramafic Massif of Bulqiza (Eastern Ophiolitic Belt, Albania) and Hints for Exploration

    By Maurizio Violo, Arjan Beqiraj, Umberto Masi

    "Abstract - Four main podiform occurrences of chromite have been distinguished in the ultramafic Bulqiza massif, Albania; they are associated from the bottom to the top with: i) basal harzburgites (lo

    Jan 1, 2000

  • CIM
    2007 SAMREC (South Africa) - The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves - 2007

    "The South African Mineral Resource Committee (SAMREC), a Working Group of the SAMREC/SAMVAL Committee (SSC), under the joint auspices of the Southern African Institute of Mining and Metallurgy (SAIMM

    Jan 1, 2003

  • CIM
    Recovery of Platinum Group Metals Using Perovskite-Type Oxide

    By Masashige Makifuchi, Hiroki Kumakura, Kota Nagai, Takahiro Kikuchi

    "A large amount of platinum group metals (PGM) are used in automobile catalyst. It is important to recover the metals from wasted catalyst. Nomura and Kageyama (2013) suggested recovery process that P

    Jan 1, 2016

  • CIM
    Corefco Refinery - Review of Operations

    By R. Krentz, P. D. Cordingley

    The nickel-cobalt sulphides produced from limonitic laterite ores by Moa Nickel S.A. in Cuba are refined at the Corefco nickel-cobalt refinery in Canada. Major changes to the refining process were req

    Jan 1, 2005

  • CIM
    Alternative to Improve the Traditional Chinese Copper Smelter

    By S. Demetrio

    China has a traditional segment of Copper Smelters with its own Chinese technology, typically small in size from 20.000 to 50.000 tCu/a, and they are responsible for the processing and production of m

    Jan 1, 2007

  • CIM
    Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed

    By A. Allaire

    The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to

    Jan 1, 2012

  • CIM
    Productivity improvements for dragline operations using controlled blasting in a single- and multiple-seam opencast coal operation at Rietspruit, South Africa

    By W. A. Crosby, W. K. Smith, K. L. McDonald

    "IntroductionThis paper describes how the introduction of two blasting techniques and the resuItant development of new dragline digging methods have increased the productivity of single- and double-se

    Jan 1, 1983

  • CIM
    Roles of Metal Oxidation Species in the Flotation of Fine Sulphide Minerals

    In this study, flotation of fine galena, chalcopyrite and pyrite was performed after grinding with different extent of oxidation-reduction condition adjusted by grinding media. Sodium dithionite and i

    Jan 1, 2006

  • CIM
    Arsine Risk Management at CCR’s Electrolyte Purification Plant

    By A. Majumdar, B. Servière, H. Persson

    The CCR refinery, which was built in 1931, treats both internal and third party copper anodes to produce 325,000 mt of copper as cathodes. These anodes contain high levels of impurities, such as Ni, A

    Jan 1, 2019

  • CIM
    Increasing Cezinc's Magnesium Bleed Capacity

    By E. Benguerel, G. Monteith, L. Centomo, S. Pelletier

    In early 2007, it became apparent that with changing concentrate feeds, the magnesium (Mg) load projected for CEZinc starting in 2009 and beyond would quadruple and overwhelm the current Mg process bl

    Jan 1, 2008

  • CIM
    The Utility of the ISO 45001:2018 Framework to Generate Risk Profiles and Mitigation Strategies for the Worker/Asrine Gas Exposure Risk

    By B. Krysa, A. Mitsui, T. L. Koehler

    The presence of arsenic, even at trace levels, in copper processing leads to the risk of arsine gas where reducing conditions exist that can reduce any soluble arsenic present to its minus 3 valance s

    Jan 1, 2019

  • CIM
    Back to basics: the feasibility study

    By C. R. Lattanzi, M. J. Davie, L. D. Smith, J. R. Goode

    "The feasibility study determines the technical and economic viability of a project at the level of accuracy required by the owner to make an investment decision. The economic analysis usually include

    Jan 1, 1991