Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Experience with Different Underground Mining Methods at Dolphin Mine of King Island Scheelite

    By Nag D. K

    The Dolphin Scheelite orebody is located near the old mining town of Grassy on the south-east comer of King Island in Tasmania. Surface open cut mining of the Dolphin deposit was conducted for a num

    Jan 1, 1995

  • AUSIMM
    Sampling and Analysis Without Fear or Favour

    Sampling and analysis of mineral deposits need to be executed without fear or favour of financial or personal impacts. Examples are given to illustrate the effects of departures, witting and unwitting

    Jan 1, 2004

  • AUSIMM
    Risk Quantified Ore Control in Open Pit Gold Mining

    By Coskun B

    The classification of selective mining units (SMU's) and the assignment of grades to those classified SMU's are very important in open pit mining, especially for precious metal mining. Dur

    Jan 1, 1998

  • AUSIMM
    Thermal Reactivation of Carbon Used in the Recovery of Gold from Cyanide Pulps and Solutions

    By Miovski P, Hooft P. V

    In the majority of recently commissioned gold mines granular activated carbon is used to adsorb gold from alkaline cyanide pulps or solutions. At the same time the carbon also adsorbs many other i

    Jan 1, 1987

  • AUSIMM
    Retardation of Oxidation of Pyritic Concentrate

    A method for determining the relative degree of oxidation of concentrate samples was established, and various surface-active materials and protective systems were examined as oxidation inhibitors. Sod

    Jan 1, 1963

  • AUSIMM
    Facing the Post-Industrial Era

    Giving the keynote address in the final session of a conference dealing with closely related topics has a disadvantage in that much of what can be said has been said. It also has an advantage, how

    Jan 1, 1978

  • AUSIMM
    Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground Voids

    By M E. Pierce

    Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two

    Jan 1, 2003

  • AUSIMM
    The Effects of Ore Petrology on Downstream Processing Performance: A Review

    Ore petrology will fundamentally determine the types of metallurgical processes employed for ore treatment, their operational efficiency and the nature of processing problems encountered. It is ther

    Jan 1, 1998

  • AUSIMM
    Blair Anthol Coal Mine Project a Case History in Planning and Management

    By Maxwell HW

    Pacific Coal Pty Limited (a wholly owned subsidiary of CRA Limited) managed the interests of six members of a joint venture formed to mine and export eight million tonnes of export quality steamin

    Jan 1, 1986

  • AUSIMM
    Hoisting in Raise-Bored Shafts

    By Northcote GG

    There are many underground mines with shaft or decline access with limited production capacity or where the mine may become uneconomical as trucking costs escalate with increasing depth of the decl

    Jan 1, 1978

  • AUSIMM
    Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment Plant

    The reasons for including treatment of water in Whites and Intermediate open cuts in the overall rehabilitation strategy are given in the introduction. The target quality of the treated water also

    Jan 1, 1984

  • AUSIMM
    The Broken Hill Lode û Its Geological Structure

    Perhaps no aspect of the investigation of an ore-deposit is of greater importance to the mining geologist and engineer than a consideration of its geological structure. A thorough understanding of the

    Jan 1, 1932

  • AUSIMM
    Regional Distribution of Silver Deposits on the Pacific Rim

    By Smith DM Jr

    Silver deposits, in which silver forms at least fifty percent of the value of the ore, are abundant and large on the east side of the Pacific and are absent in the western Pacific. To determine if

    Jan 1, 1987

  • AUSIMM
    Planning and Commencement of Rehabilitation at the Hedges Gold Mine WA

    Environmental impact and rehabilitation on completion are primary considerations in obtaining approval for mine projects from government authorities.This paper focuses on the planning and commencement

    Jan 1, 1992

  • AUSIMM
    Construction and Utilisation of the Olympic Dam Service Decline

    The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a

    Jan 1, 1988

  • AUSIMM
    Practical Problems in Chemical Control of Flotation

    By Woodcock JT

    Successful chemical control of flotation requires practical solutions to many problems. A brief discussion is first given of those para- meters which can be controlled and those which it would be d

    Jan 1, 1978

  • AUSIMM
    Mining a Narrow Ore Body - Innovative Mining and Blasting Methods

    By LeJuge G. E, McKenzie C. K

    Innovative mining and blasting techniques were demanded at the Richmont Mines, Francoeur Mine in Quebec, Canada, by a narrow, shallowly dipping high grade gold ore body. The ore body being mined oc

    Jan 1, 1992

  • AUSIMM
    Structure of the Roof at the End of Longwall Face and Its Support

    Two ends of a longwall face are not only concentrated locations of equipment, but also provide ventilation and access. The roof strata stability here has an important influence on mining coal and

    Jan 1, 1986

  • AUSIMM
    Spoil Pile Instability with Reference to the Goonyella Mine, Queensland

    The characteristics and causes of the spoil pile failures at the Goonyella Mine are described, and research results from investigations of spoil pile instability are discussed. Some effects on spoil

    Jan 1, 1981

  • AUSIMM
    Doing the Right Things Right ù Identifying and Implementing the Mine Plan That Delivers the Corporate Goals

    By B Hall

    The authors have undertaken many independent mine optimisation and operational improvement projects at Australian and international mining operations over the past decade. This work has provided an un

    Jan 1, 2006