Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rehabilitation, Recommissioning and Upgrading of the Leinster Nickel Concentrator

    By Millett R

    In January 1989, Western Mining Corporation (WMC) acquired the Perseverance and Rocky's Reward orebodies and associated infrastructure from the Agnew Mining Company (AMC). AMC had closed the o

    Jan 1, 1991

  • AUSIMM
    Limitations in the Application of Column Flotation

    By Williams SR

    Column Flotation cannot be used indiscriminately. Based on extensive pilot plant experience at Lakefield Research, a number of limiting parameters have been identified for the application of column

    Jan 1, 1993

  • AUSIMM
    Zinc Flotation at Roseberry - Complex but Not Difficult

    From 1980 to February 1991 the Rosebery concentrator purchased ore from Aberfoyle's Que River Mine. Following the termination of the contract the concentrator reverted to treating Rosebery ore

    Jan 1, 1993

  • AUSIMM
    The Greenhouse Effect and High-Moisture Coals

    By Fernando N, Guang LX

    Brown coal in Victoria in spite of its substantial reserves is not utilized greatly because of its high moisture content(-65% w/w). Transportation and handling costs of raw brown coal, on an availa

    Jan 1, 1989

  • AUSIMM
    Computer Simulation to Aid Open Cut Plant Selection

    The paper describes a computer model developed within the State Electricity Commis- sion of Victoria for use in open cut planning. The purpose of the model is to simulate all the typical occurrence

    Jan 1, 1982

  • AUSIMM
    Mineralogical and Chemical Analysis of Quartzites Used in the Production of Silicon

    By Phillips D. N, Herbert H. K, Fletcher A. C, Lewis R. K

    Quartzite is a common feedstock used for the production of silicon by reduction at high temperatures in a submerged electric arc furnace. Silica fume, formed as a by-product in this process, contains

    Jan 1, 1995

  • AUSIMM
    Presidential Address 1926

    Mr. Bradford said: - On assuming this chair, which has been oc- cupied by so many gentlemen of conspicuous ability, my first words must be an expression of the gratitude I feel for the honour you hav

    Jan 1, 1987

  • AUSIMM
    Coal - Paper No. 8 Use Of Optimal Techniques To Minimise Moisture Retension In Fine Coal Filtration

    By Sergeant G. D, Norman J. R

    The importance of reducing the moisture content of fine coal, the nature of the retained water and the means of its removal are discussed. A statistical technique, using a balanced block design, was

    Jan 1, 1969

  • AUSIMM
    Coal as a Fuel and Reductant in Sirosmelt Furnaces

    By Lightfoot BW, Bultitude-Paull J

    The Sirosmelt top submerged lancing system has many applications in the smelting of base metal and complex materials. It has particular advantages for smaller scale smelting and the treatment of re

    Jan 1, 1987

  • AUSIMM
    Combustion of Chalcopyrite Pyrite, Galena and Sphalerite Under Simulated Suspension Smelting Conditions

    A laminar-flow furnace was used to study the combustion of four flotation concentrates (chalcopyrite, pyrite, galena, and sphalerite) in air at temperatures up to 1400¦C. A special- Iv developed tw

    Jan 1, 1980

  • AUSIMM
    Mine Planning Succeeds on a Dedicated Minicomputer

    By McDonald E, Clifford PJ

    A mine planning system comprises all elements necessary to carry out the full range of mine planning activities from exploration to operations control. The application of computers as part of a mi

    Jan 1, 1983

  • AUSIMM
    Formcoke

    The major incentives for developing continuous processes for the production of formcoke are to achieve a wider range of coals which can be used, greater operating flexibility enabling the production

    Jan 1, 1975

  • AUSIMM
    Learning from Nuclear Waste Repository Design: the Ground-Control Plan (9344425e-0fdb-451a-8179-1134301c90ee)

    With mining development on hold and other underground works in a slowdown, the development of nuclear wa te repositories takes centre tage on the American rock engineering scene. Three repositorie for

    Jan 1, 1988

  • AUSIMM
    An On-Line Conveyor Burden Measurement System Using Computer Imaging Techniques

    By Tyson G. R

    A novel system has been developed using computer imaging techniques to make on-line measurements of material on a moving conveyor. Meas- urements of the mass or volume of conveyor materials are impor

    Jan 1, 1989

  • AUSIMM
    Improving Coal Mining Production Performance Through the Application of Total Production Mangement

    This paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th

    Jan 1, 1998

  • AUSIMM
    Laboratory Studies in Comminution - Part II Rod Versus Ball Milling of a Tin Ore

    By Quast K. B

    Laboratory batch rod and ball milling tests were conducted on samples of Heavy Medium Separator (HMS) sinks from Renison Tin Limited. The product size distributions for this heterogeneous material wer

    Jan 1, 1995

  • AUSIMM
    Penetration behaviour of an initial sinter melt into substrates of different ore types

    By S Hapugoda, H Han, L Lu

    Sinter quality depends heavily on the mineral phases, textures and physical structure of the sinter, which are formed upon solidification of the sinter melt. The interaction of sinter initial melt wit

    Nov 8, 2021

  • AUSIMM
    Metalliferous Mineralisation in Northeast Queensland: A Review of the Eighties and a View Towards the Nineties

    Following unprecedented high market prices for tin and gold in 1980, significant advances in both mining technology and geological knowledge took place in northeast Queensland. These led to a rapid gr

    Jan 1, 1990

  • AUSIMM
    Gas Properties of Australian Coal

    By Hargraves A. J

    At 4 MPa gas pres ure and 30°C the sorptive capacity of 10 selected Australian dried coal ranges from 17 to 23 m3/tonne of CH4 and 27 to 36 m3/tonne of CO2. Values for moist coals are about 25 pe

    Jan 1, 1985

  • AUSIMM
    Resource Saving Technology of Comminution

    By Yeliseyev AK, Shestakov AM

    Comminution is the most power-intensive process in the technology for ferrous quartzite concentration. That is why improving comminution efficiency leads to the most appreciable economic effect on

    Jan 1, 1993