Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Preliminary Investigation of the Jurassic Coals of the Perth BasinIn 1961, West Australian Petroleum's Eneabba No. 1 bore encountered 22 seams of coal totalling 40 ft in thickness between the depths of 6373 ft and 6441 ft. On analysis, this coal had a similar c
Jan 1, 1964
-
Plan compliance process for underground coal mines - SynopsisBy A. A. Angelov
This paper presents a unique method of monitoring the effectiveness of the planning process as well as the execution of mine plans. The method primarily determines the degree of deviation from the ori
Jan 1, 2010
-
Glass Earth Gold Exploration: Combining Geoinformatics Data InterventionBy J Cahill, D Holden, R Stuart, G Cryan, W Power, W Stratford, S Garwin
The combination of Stage 1 Geoinformatics legacy data intervention processes with the Stage 2 ultra-detailed airborne geophysical prospecting demonstrates a new approach to converting data to informat
Jan 1, 2005
-
Properties and Potential Applications of Meso-Porous GoldBy Michael B. Cortie
Mesoporous gold sponge has the unique property of being both metallic and highly resistant to oxidation. It has potential application in catalysis, in bio-sensors, in optical coatings, in analytical c
Oct 1, 2003
-
Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)By Christopher J. Bise
INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by
Jan 1, 1986
-
Mineralogical, Petrographical and Geochemical Investigations of Outbursting in Australian Coal MinesBy Hart G. H
In tectonically disturbed zones within coal seams, decreases in the amount of kaolinite in the cellular structure of inertiniterich coal are accompanied by increasing kaolinite contents in fractures w
Jan 1, 1983
-
Application of Lane’s cut-off grade model to a gold open pit mining projectBy Lino Arias
The main objective of this project is to review and develop a comprehensive application of Lane’s cut-off grade model to a case study, as well as to compare its principles and results compared to brea
Sep 1, 2017
-
Mining Complex Geology, Mitigation of Float Dust, and Developing Autonomous Machine Capability Using Horizon Sensing Technology for Coal Seam Boundary DetectionBy L. G. Stolarczyk, J. Duncan
"SynopsisLong before the environmental movement, coal miners were suffering from occupational diseases that became apparent in the later years of service, and especially during the retirement years. C
Jan 1, 2015
-
Breakage mechanisms and an encouraging correlation between the Bond parameters and the friability value ? SynopsisBy H. T. Ozkahraman
It is important to know the breakage mechanism in materials since this knowledge influences the results of subsequent grinding operations. There are two distinct failure mechanisms in breakage: one is
Jan 1, 2010
-
Producing - Equipment, Methods and Materials - Effect of Isolated Vertical Fractures Existing in the Reservoir on Fluid Displacement ResponseBy J. W. Givens, P. B. Crawford
A potentiometric model study has been made of the effect of vertical fractures existing in the matrix of the reservoir on the flooding or cycling performance. Fractures can have unusual flow character
Jan 1, 1967
-
Evolution Of Piling Design And Techniques In Mudstone At Manchester AirportBy Colin Curtis
In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is
Jan 1, 2001
-
Tunnel Cost ModelBy Charles H. Minott, Michael J. Markow, Robert D. Wyatt, Fred Moavenzadeh
The substantial investment in tunnels anticipated in the next twenty years has focused new attention on the economics of tunnel construction itself and on some costly problems associated with undergro
Jan 1, 1974
-
Optimizing The Life Of Ore Passes In A Deep-Level Gold MineBy P. R. Brenchley
Main ore pass systems should last the life of a mine, and too often expensive and hazardous remedial measures are required to repair a damaged ore pass in an attempt to extend its life. In order to ma
Jan 1, 2006
-
Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, VictoriaGENERALTHE coal deposit, where it is being worked, consists of a bed of brown coal varying in thickness from 120 ft. to 200 ft., covered by an overburden of clay, drift, loam, etc., of a thickness of
Jan 1, 1924
-
Sulphuric Acid Plant Water Saving OptionsBy R. J. Forzatti
The production of sulphuric acid from sulphur generates heat. The majority of this heat is recovered as steam and is often used to generate electricity. Heat not recovered as steam is rejected to cool
Jan 1, 2014
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box JackingBy Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Levee Removal by Explosives, Upper Klamath Lake, OregonBy Quentin Rhoton
To benefit two endangered fish species, waterfowl and other wildlife, and water quality in the lake and downstream, the decision was made to remove levees that had been in place since the 1950s. Becau
Jan 1, 2009
-
Borehole Inspection with the HRS-1 Video SystemBy Tom Palangio, Ralph M. Olmstead
Video inspection of boreholes with cameras developed specifically for the mining industry is now possible. These designs are reliable, cost effective, and have the flexibility to be used in other appl
Jan 1, 1998
-
Treatment of the Siirt-Madenk÷y Ores by FlotationTreatment of the Siirt-Madenk÷y Ores by Flotation
Sep 13, 2010
-
The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc ConcentratorBy K S. Fisher, J D. Pease
The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro
Jan 1, 2000