Application of Lane’s cut-off grade model to a gold open pit mining project

- Organization:
- Instituto de Ingenieros de Minas del Peru
- Pages:
- 13
- File Size:
- 1421 KB
- Publication Date:
- Sep 1, 2017
Abstract
The main objective of this project is to review and develop a comprehensive application of Lane’s cut-off grade model to a case study, as well as to compare its principles and results compared to break-even cut-off grade model utilisation under the same conditions. The case study sets the context of the application: A conceptual study of a gold open pit mining project requires a cut-off grade analysis, which consists in develop a cut-off grade policy that maximises the net present value (NPV) using Lane’s and break-even model.
Citation
APA:
(2017) Application of Lane’s cut-off grade model to a gold open pit mining projectMLA: Application of Lane’s cut-off grade model to a gold open pit mining project. Instituto de Ingenieros de Minas del Peru, 2017.