Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Haul-road monitoring in openpit mines using unmanned aerial vehicles: A case study at Bald Mountain Mine siteBy MATTHEW HART, THOMAS BAMFORD, Kamran Esmaeili, MICHAL KOWALCZYK, FILIP MEDINAC
Improved haul-road conditions can have a positive impact on mine operations, resulting in heightened safety, productivity gains, longer tire life and lower maintenance costs. For these reasons, a moni
-
Utilization Of Impounded Bituminous Coal Fines For The Preparation Of Coal-Water Slurry FuelsBy Joel L. Morrison
Wet bituminous coal fines from active and abandoned slurry impoundments are currently being examined as a recoverable feedstock for the production of coal water slurry fuel (CWSF). Preliminary analysi
Jan 1, 1995
-
Design Of Pillars In Shrinkage Stoping ? 1. IntroductionBy R. W. O. Kersten
The shrinkage method of stoping with pillar support has been used at Agnes Gold Mine since mining commenced. Until recently, rock instability did not have any detrimental effect on safety or productio
Jan 1, 1982
-
Tailings storage facilities (TSFs) dust control using biocompatible polymersBy Kwangmin Kim, Taehee Lee, Minkyu Kim, JUNHYEOK PARK
Mine tailings storage facilities (TSFs) can be a significant source of fine, respirable dust. About 25 percent of the mass fraction of tailings from a hard-rock mine consists of particles of a respira
-
Identifying the location and size of an underground mine fire with simulated ventilation data and random forest modelBy Yuting Xue, Lihong Zhou, DAVOOD BAHRAMI
The paper discusses the use of machine learning (ML) to develop a predictive model for determining the location and size of underground mine fires using simulated ventilation data. The study highlight
Sep 1, 2023
-
Design and evaluation of the roof bolt corrosion test system in a simulated underground coal mine environmentBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat, A. J. S. (Sam) Spearing
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
The Itos Chloride Leach Plant For Silver - Two Years Into ProductionBy Daniel W. Kappes
In late 1995 at the Randol symposium in Squaw Valley, I gave a paper which described the Itos project flowsheet. At that time, project construction was nearly completed and stmtup was close. This pape
Jan 1, 1998
-
Carbon Sample Analyses As A Guide For Cip/cil Plant OptimizationBy A. H. Reitsema, Hans E. van Dam
In CIP, CIL, and Heap Leach gold recovery operations, a sub-optimal activated carbon performance invariably causes a significant loss of revenues. In this paper it is shown, how dedicated analyses of
Jan 1, 1995
-
Challenges, Solutions, And Reality In TBMS For The English Channel TunnelsBy John Turner, John A. Gibson, David Cass
Contents A. Introduction B. Description of Robbins Company involvement in several of the English Channel Tunnel projects C. Identification of project requirements and comparison of TBM featur
Jan 1, 1989
-
Progress in Computer Applications for Process Modeling, Simulation, and Control ? IntroductionBy H. R. Cooper
Refinements and increased sophistication in modeling and simulation, and introduction of advanced techniques in automatic control made feasible with digital processor handling of data, represent the m
Jan 1, 1989
-
Screening of concentrates for removal of contaminants at Cyprus Thompson CreekBy M. W. Harmer, J. M. Quist
Laboratory test work, pilot plant testing and plant experience with wet, fine-mesh screens are discussed. High-frequency, low-amplitude, fine-mesh, wet screens were installed on the 6th cleaner con
Jan 1, 1991
-
Some Uses of Froth Flotation for Metal Recovery from Waste StreamsBy Richard R. Klimpel
This paper discusses the use of froth flotation as a means of removing metal containing species from a variety of feed streams that generally fall into the classification of waste streams. The variabi
Jan 1, 1992
-
Air Sparging Optimization For Remediation Of MTBE And TBA Contaminated SitesBy M. I. M. Darwish
In this paper, an effort was made to get more in-sight about the parameters that can affect air sparging technique optimization. Numerical simulations were used in predicting the effects of different
Jan 1, 2008
-
Neural Network Coupled Acoustic Emission Sensors for Rock Grinding and DrillingBy S. L. Jung, T. L. Nichols, K. Prisbrey
The problem was to evaluate the on-line detection of rock properties through acoustic emission sensors. Acoustic emission sensors, when attached to crushers, grinders, and roof bolters, are robust, ec
Jan 1, 1993
-
Use Of Diamond Tipped Picks For Dust Control On Longwall FacesBy R. D. Lama
This paper presents the results of a large scale trial of polycrystalline diamond picks (PDC) on longwalls with particular reference to dust control. Results from fixed position monitoring showed that
Jan 1, 1993
-
Planning For Sustainable Land Use Management In Surface Coal Mining AreasThe present contribution examines the main components of a sustainable land reclamation program applicable to surface coal mines and the environmental threats that hinder the transition to sustainable
Jan 1, 2003
-
Methodology For Geotechnical Evaluation Of An Underground Powerhouse In Weak RockBy D. M. Cregger, J. L. Rosenblad, R. E. Ranken
The construction of a large span, high-walled underground opening in a low strength shale rock is unprecedented. The feasibility of constructing a pumped storage project with several tunnels and a lar
Jan 1, 1983
-
Using Mobile Roof Supports For Pillar Extraction at Martin County CoalBy K. F. Unrug
Martin County Coal Corp. is located in Martin County, KY, in the Appalachian coal fields, near the West Virginia border. The company's total leasehold covers more then 133.5 km' (33,000 acre
Jan 1, 1991
-
Applications Of The Seismic Interactive Interpretation Workstation For The Coal IndustryBy L. M. Gochioco
The Seismic Interactive Interpretation Workstation (S//W) provides a wide spectrum of utilities ranging from improving field acquisition techniques, data processing and interpretation of coal seismic
Jan 1, 1992
-
Changing potential for the electrical beneficiation of minerals by chemical pretreatmentBy K. Hanumantha Rao, K. S. E. Forssberg, H. R. Manouchehri
The responses of calcite, feldspar and quartz minerals in a laboratory free-fall electrostatic separator after tribocharging with stainless steel, PVC and copper plates were investigated. The effects
Jan 1, 2000