The Itos Chloride Leach Plant For Silver - Two Years Into Production

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 2
- File Size:
- 246 KB
- Publication Date:
- Jan 1, 1998
Abstract
In late 1995 at the Randol symposium in Squaw Valley, I gave a paper which described the Itos project flowsheet. At that time, project construction was nearly completed and stmtup was close. This paper describes the ltos operation since then. To summarize things, startup occurred partially in late 1995 with full startup of all components in about mid 1996. From then until now, April 1998, the plant has been running at partial capacity and has yet to achieve full production rates.