Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Big Hole Drilling -- The State Of The ArtBy M. D. Lackey
The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being
Jan 1, 1983
-
Helping Banks To Manage Mineral Land TrustsBy S. M. Pickering
Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties
Jan 1, 2002
-
Port of Miami Tunnel Update?A View From Design Builder?s EngineerBy Wern-ping Chen
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn
-
Designing, Installing and Maintaining Clean, Stable and Efficient Conveyor Belt SystemsBy R. P. Stahura
Conveyors are the lifeline of mining and processing operations. They continuously supply materials to and carry finished products and waste away from operations. When conveyors are running at less tha
Jan 1, 1992
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
The circumstances, events and politics leading the closure of the U.S. Bureau of Mines ? was it the correct decision?By J. Harrison Daniel
Were the legislators and politicians responsible for the closing of the U.S. Department of the Interior?s Bureau of Mines (Bureau) in March 1996 fully aware of what they were doing? Throughout the Uni
Jan 4, 2010
-
Rock Melting Subterrenes--Their Role In Future Excavation TechnologyBy Charles A. Bankston, John C. Rowley, Robert J. Hanold, Joseph W. Neudecker
The basic concepts and processes of soil and rock melting as applied to excavation technology are reviewed. The electrically heated, small diameter prototype penetrator development sequence is present
Jan 1, 1974
-
Putting Computational Fluid Dynamics To Work On Mining And Metals ProjectsBy D. M. Lane, J. M. Berkoe
Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu
Jan 1, 2000
-
Impact of deformable materials and convergence on the transverse load capacity of mine ventilation stoppingsBy T. J. Batchler
Deformable materials are sometimes added to ventilation stopping constructions to prevent damage caused by convergence in coal mines. However, adding deformable materials can significantly reduce the
Jan 1, 2009
-
Mining Faculty in the United States: Current Status and SustainabilityBy M. K. McCarter
The history of mining education, like the history of the mining industry, is typified by “boom and bust” cycles. In academia, the perpetual problem can be stated as “too many graduates for the jobs o
Jan 1, 2007
-
Applicable Analytical Tools For A Seismic Design Of Underground ExcavationsBy Christopher M. St. John, Tony F. Zahrah
Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu
Jan 1, 1985
-
On-Line Rheometer For Mineral SlurriesBy S. K. Kawatra, A. K. Bakshi, T. C. Eisele
An on-line rheometer, suitable for use with slurries, has been developed at Michigan Technological University. This rheometer can be used with both Newtonian and non-Newtonian slurries, and produces c
Jan 1, 1999
-
West Elk Mine: The Conversion From An Exhausting To A Forcing Ventilation SystemBy J. C. Poulos
The West Elk Mine is located near Somerset, Colorado approximately 70 miles southeast of Grand Junction, Colorado and 72 miles southwest of Glenwood Springs, Colorado on state highway 133 (Figure 1).
Feb 27, 2013
-
Improved Process Control Through Real-Time Measurement Of Mineral ContentBy D. Hopkins, D. Türler, R. D. Giauque, W. B. Davis, M. Karaca
In a highly collaborative research and development project with mining and university partners, sensors and data-analysis tools are being developed for rock-mass characterization and real-time measure
Jan 1, 2002
-
Recent Advancements In Slurry Shield TunnelingBy Yoshihiro Kawarabata
INTRODUCTION With only about 30% of Japan's entire population served by sewer systems at the end of 1980, extensive sewerage construction programs have been implemented. As major sewer network
Jan 1, 1983
-
Large Excavator Cuts Operating Costs at Alabama Coal MineBy Bill Elverman
Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations
Jan 1, 2005
-
Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon MineBy I. Demers
Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were
Jan 1, 2008
-
Geotechnical Exploration For The H-3 Highway Trans-Koolau TunnelBy Lee W. Abramson, William H. Hansmire
The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val
Jan 1, 1989
-
Implementation Of Corporate Biodiversity Management ProgramBy M. Hamarat
Freeport-McMoRan Copper & Gold (FCX) is committed to preserving and enhancing biodiversity in the areas in which we operate. As a member of the ICMM, FCX is committed to implement the 10 Sustainable D
Jan 1, 2011
-
Terex Trucks Operate at Coal Reclamation ProjectMine Terex articulated dump trucks are working on a large restoration project of an abandoned open cast coal site in Blacklaw, central Scotland. The project is part of the construction of a 42-turbin
Jan 1, 2005