Evaluation Of Cyanide Producing Microorganisms To Recover Gold From Low-Grade Ore ? IntroductionBy D. Shin
The gold leaching using cyanide from ore or waste has been almost universally in use [1]. Recently, biological gold bioleaching using cyanide producing bacteria, e.g. Chromobacterium violaceum, Pseudo
Jan 1, 2012
-
Copper Precipitation And Cyanide Recovery Pilot Testing For The Newmont Yanacocha ProjectBy S. Acar, M. Botz
Introduction In 2007, Newmont Mining Corporation will begin construction of a milling and cyanidation leaching circuit for the Yanacocha site in Peru. Ore to be processed in the circuit contains a r
Jan 1, 2007
-
An Underground Concept For Oil Field Development In Offshore AreasBy Cherie H. Tilley
The possibility of drilling oil wells from underground locations is not a new concept. It bas not been cost effective for the oil industry in the past and therefore disregarded. Today's state of
Jan 1, 1983
-
Port of Miami Tunnel Update?A View From Design Builder?s EngineerBy Wern-ping Chen
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn
-
Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel ProjectBy Faruk Oksuz, Phillip L. Covell, Martin Doll
A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200
Jan 1, 2007
-
Creation Of An Underground Mine Development Sequencing OptimizerBy M. J. Blattman
Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret
Jan 1, 2003
-
Big Hole Drilling -- The State Of The ArtBy M. D. Lackey
The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being
Jan 1, 1983
-
Mine and Mill Labor Productivity Study Shows Wide Range of ValuesBy Leons Kovisars
Introduction Labor is the major cost element for most mining operations. Labor costs are continually increasing, both in nominal and constant terms. This is true in developed as well as less develope
Jan 11, 1983
-
Helping Banks To Manage Mineral Land TrustsBy S. M. Pickering
Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties
Jan 1, 2002
-
Timber Supported System – IntroductionBy George L. Wilhelm
Timber support of mine openings continues to be an effective system for ground support, due to its avail¬ability, flexibility, and ease of installation. Timber support of mine openings as a primary m
Jan 1, 1982
-
Designing, Installing and Maintaining Clean, Stable and Efficient Conveyor Belt SystemsBy R. P. Stahura
Conveyors are the lifeline of mining and processing operations. They continuously supply materials to and carry finished products and waste away from operations. When conveyors are running at less tha
Jan 1, 1992
-
The circumstances, events and politics leading the closure of the U.S. Bureau of Mines ? was it the correct decision?By J. Harrison Daniel
Were the legislators and politicians responsible for the closing of the U.S. Department of the Interior?s Bureau of Mines (Bureau) in March 1996 fully aware of what they were doing? Throughout the Uni
Jan 4, 2010
-
Impact of deformable materials and convergence on the transverse load capacity of mine ventilation stoppingsBy T. J. Batchler
Deformable materials are sometimes added to ventilation stopping constructions to prevent damage caused by convergence in coal mines. However, adding deformable materials can significantly reduce the
Jan 1, 2009
-
Improved Process Control Through Real-Time Measurement Of Mineral ContentBy D. Hopkins, D. Türler, R. D. Giauque, W. B. Davis, M. Karaca
In a highly collaborative research and development project with mining and university partners, sensors and data-analysis tools are being developed for rock-mass characterization and real-time measure
Jan 1, 2002
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
Putting Computational Fluid Dynamics To Work On Mining And Metals ProjectsBy D. M. Lane, J. M. Berkoe
Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu
Jan 1, 2000
-
Rock Melting Subterrenes--Their Role In Future Excavation TechnologyBy Charles A. Bankston, John C. Rowley, Robert J. Hanold, Joseph W. Neudecker
The basic concepts and processes of soil and rock melting as applied to excavation technology are reviewed. The electrically heated, small diameter prototype penetrator development sequence is present
Jan 1, 1974
-
Mining Faculty in the United States: Current Status and SustainabilityBy M. K. McCarter
The history of mining education, like the history of the mining industry, is typified by “boom and bust” cycles. In academia, the perpetual problem can be stated as “too many graduates for the jobs o
Jan 1, 2007
-
West Elk Mine: The Conversion From An Exhausting To A Forcing Ventilation SystemBy J. C. Poulos
The West Elk Mine is located near Somerset, Colorado approximately 70 miles southeast of Grand Junction, Colorado and 72 miles southwest of Glenwood Springs, Colorado on state highway 133 (Figure 1).
Feb 27, 2013
-
Applicable Analytical Tools For A Seismic Design Of Underground ExcavationsBy Christopher M. St. John, Tony F. Zahrah
Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu
Jan 1, 1985