Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    New trends in underground mine communications

    By Raymond C. Voige

    "The use of current electronic technology in the design of new underground mine communications equipment is providing improved and expanded voice communications which can, in turn, contribute to impro

    Jan 1, 1981

  • CIM
    Corrosive Wear and its Control in Ball Mill Grinding - A Progress Report

    By Dr. G. R. Hoey

    "Abrasive wear and corrosive wear of carbon-steel grinding balls occurred simultaneously during the wet-grinding of hematite iron ore, and Ni-Cu sulphide ore, in laboratory ball mills. Two corrosion c

    Jan 1, 1974

  • CIM
    Developments in Fine Gravity Concentration Using the Bartles-Mozley Table

    By R. O. Burt, D. J. Ottley

    "SYNOPSISRecent developments in the use of the Bartles-Mozley table and the Bartles CTS screen are described for the gravity preconcentration of fine heavy mineral and metal particles present in low g

    Jan 1, 1973

  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Mine ventilation fan specification and evaluation

    By J. S. Stachulak, K. A. Mackinnon

    This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera

    Jan 1, 2004

  • CIM
    Methodologies for Scale Up of Grinding and Flotation Circuits for New CVRD Projects

    By K. L. C. Gonçalves, V. K. Alves

    "CVRD’s Department of Development and Technology – GETEK has been developing and perfecting a general methodology for scaling up flotation and grinding circuits over several years. This methodology ha

    Jan 1, 2006

  • CIM
    Diamond Recovery Technologies

    By John Lindsay

    Outline ??Recovery plant requirements and concepts ??Common recovery plant unit processes ??Recovery plant design considerations ??Peripheral issues Process Design ??Liberation ??Separation ??

    Apr 1, 2005

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • CIM
    Switched Reluctance Drive: The Ideal Feeder Drive

    By Svato Prochazka

    Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?

    May 1, 2010

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Social indicators for mining in Ancash, Peru: combining community objectives, technical considerations and community relations insight to design a practical framework.

    By Carol J. Odell

    As a mining social practitioner, social indicators are within the purview of required competencies. A situation, where the ER manager requested assistance in quickly deriving a few social indicators f

    May 1, 2010

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • CIM
    International mineral resource and mineral reserve classification and reporting systems

    By S. Felderhof, W. S. Vaughan

    "Over the years, it has been increasingly difficult for the minerals industry to raise the necessary capital for its activities. To alleviate this phenomenon, complete transparency and capital market

    Jan 1, 2005

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    Application of Non-Intrusive Sonar Array-Based Technology to Solve Unique and Difficult Measurement Situations

    By Joseph Poplawski, Christian O’Keefe, Robert Maron

    "Unique and difficult minerals processing measurement situations will be described and the application of passive array-based technology for performing these measurements will be illustrated. Examples

    Jan 1, 2008

  • CIM
    Characterization of Nanometer and Ultrafine Diesel Aerosols in the Underground Mining Environment

    By Aleksandar D. Bugarski

    Despite extensive research efforts conducted in the past decades, occupational health risks associated with exposure to nano and ultrafine aerosols emitted by diesel power equipment are still not comp

    May 1, 2007